I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Piping symbols are graphical representations of pipes, valves, fittings, and other components used in piping systems. Isometric drawings provide a 3D view of the piping system.
Piping symbols include straight pipes, elbows, tees, reducers, valves, and pumps
Isometric drawings show the piping system in 3D with dimensions and annotations
Symbols and isometric drawings are used to communicate design and construction details
Scaffolding selection depends on the type of work, height, weight, and duration of use.
Assess the type of work to be done
Consider the height and weight requirements
Evaluate the duration of use
Choose the appropriate scaffolding type, such as frame, system, or suspended scaffolding
Ensure compliance with safety regulations and standards
The pipe/equipment material is installed in the plant by following a systematic process.
First, conduct a thorough analysis of the plant layout and design to determine the optimal location for pipe/equipment installation.
Prepare the work area by ensuring it is clean, safe, and free from any obstructions.
Inspect the pipe/equipment material for any defects or damage before installation.
Use appropriate tools and equipment ...
Pre shutdown activities are the tasks that need to be completed before shutting down a plant or equipment.
Preparing the equipment for shutdown
Draining and cleaning the equipment
Isolating the equipment from the rest of the system
Performing necessary maintenance and repairs
Removing any hazardous materials
Ensuring all safety measures are in place
Communicating with all relevant personnel
Obtaining necessary permits and appr
Shutdown activities refer to the planned maintenance or repair work that is carried out on equipment or systems during a shutdown period.
Shutdown activities involve shutting down equipment or systems for maintenance or repair work
Activities may include inspections, repairs, replacements, and upgrades
Shutdowns are typically scheduled in advance to minimize disruption to operations
Examples of shutdown activities include ...
Post shutdown refers to the activities carried out after a plant shutdown to ensure safe and efficient resumption of operations.
Post shutdown activities include inspection and testing of equipment, cleaning and maintenance of pipelines, and ensuring compliance with safety regulations.
The duration of post shutdown activities depends on the complexity of the plant and the extent of maintenance required.
Examples of post s...
Top trending discussions
posted on 14 Jul 2022
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
posted on 12 Mar 2023
based on 3 reviews
Rating in categories
Piping Supervisor
6
salaries
| ₹6 L/yr - ₹14.4 L/yr |
Instrumentation Supervisor
5
salaries
| ₹11.4 L/yr - ₹15 L/yr |
Mechanical Supervisor
5
salaries
| ₹8.4 L/yr - ₹15 L/yr |
Safety Officer
5
salaries
| ₹1.1 L/yr - ₹6.8 L/yr |
Electrical Supervisor
5
salaries
| ₹6 L/yr - ₹21.2 L/yr |
Quess
Team Lease
Security and Intelligence Services (India)
G4S