I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Piping symbols are graphical representations of pipes, valves, fittings, and other components used in piping systems. Isometric drawings provide a 3D view of the piping system.
Piping symbols include straight pipes, elbows, tees, reducers, valves, and pumps
Isometric drawings show the piping system in 3D with dimensions and annotations
Symbols and isometric drawings are used to communicate design and construction details
Scaffolding selection depends on the type of work, height, weight, and duration of use.
Assess the type of work to be done
Consider the height and weight requirements
Evaluate the duration of use
Choose the appropriate scaffolding type, such as frame, system, or suspended scaffolding
Ensure compliance with safety regulations and standards
The pipe/equipment material is installed in the plant by following a systematic process.
First, conduct a thorough analysis of the plant layout and design to determine the optimal location for pipe/equipment installation.
Prepare the work area by ensuring it is clean, safe, and free from any obstructions.
Inspect the pipe/equipment material for any defects or damage before installation.
Use appropriate tools and equipment ...
Pre shutdown activities are the tasks that need to be completed before shutting down a plant or equipment.
Preparing the equipment for shutdown
Draining and cleaning the equipment
Isolating the equipment from the rest of the system
Performing necessary maintenance and repairs
Removing any hazardous materials
Ensuring all safety measures are in place
Communicating with all relevant personnel
Obtaining necessary permits and appr
Shutdown activities refer to the planned maintenance or repair work that is carried out on equipment or systems during a shutdown period.
Shutdown activities involve shutting down equipment or systems for maintenance or repair work
Activities may include inspections, repairs, replacements, and upgrades
Shutdowns are typically scheduled in advance to minimize disruption to operations
Examples of shutdown activities include ...
Post shutdown refers to the activities carried out after a plant shutdown to ensure safe and efficient resumption of operations.
Post shutdown activities include inspection and testing of equipment, cleaning and maintenance of pipelines, and ensuring compliance with safety regulations.
The duration of post shutdown activities depends on the complexity of the plant and the extent of maintenance required.
Examples of post s...
I applied via Newspaper Ad and was interviewed before May 2023. There was 1 interview round.
HV cable jointing method involves connecting high voltage cables using specialized techniques and materials.
HV cable jointing is typically done using heat shrinkable sleeves or cold shrinkable joints.
The joints must be properly insulated to prevent electrical leakage and ensure safety.
Specialized tools and equipment are used for cable preparation, insulation, and sealing.
Proper training and certification are required f...
Top trending discussions
posted on 18 Feb 2025
Group discussion for senior team and HR team also discussed than Joni employee
posted on 5 Feb 2025
I was interviewed in Jan 2025.
Assignments in marketing and sales involve processes related to product development, technology, and service taxation, as well as the enhancement of listening skills and other developmental processes beyond the same assignments.
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
If any adjustments I will manage
I applied via Walk-in and was interviewed in Dec 2024. There were 5 interview rounds.
Round one discuss to your name address qualification which company experience which department
Round 2 check your check your experience your behaviour
I was interviewed in Jan 2025.
I am involved in analyzing financial statements, assessing credit risk, and making recommendations for loan approvals.
Analyzing financial statements to evaluate creditworthiness of potential borrowers
Assessing credit risk by reviewing credit reports and conducting financial analysis
Making recommendations for loan approvals based on credit analysis findings
I prioritize tasks based on deadlines and importance, delegate when possible, and utilize time management techniques.
Prioritize tasks based on deadlines and importance
Delegate tasks when possible to team members
Utilize time management techniques such as creating to-do lists and setting reminders
Break down large tasks into smaller, manageable chunks
My salary expectations are in line with industry standards and commensurate with my experience and qualifications.
Research industry standards for Credit Analyst salaries
Consider my experience and qualifications when determining salary expectations
Be prepared to negotiate based on the overall compensation package offered
based on 2 interviews
Interview experience
based on 55 reviews
Rating in categories
Piping Supervisor
7
salaries
| ₹6 L/yr - ₹14.4 L/yr |
Instrumentation Supervisor
5
salaries
| ₹11.4 L/yr - ₹15 L/yr |
Mechanical Supervisor
5
salaries
| ₹8.4 L/yr - ₹15 L/yr |
Safety Officer
5
salaries
| ₹1.1 L/yr - ₹6.8 L/yr |
Electrical Supervisor
5
salaries
| ₹6 L/yr - ₹21.2 L/yr |
Quess
Team Lease
Security and Intelligence Services (India)
G4S