Upload Button Icon Add office photos

Filter interviews by

INTEGRAL SERVICES COMPANY Interview Questions and Answers

Updated 27 May 2024

INTEGRAL SERVICES COMPANY Interview Experiences

Popular Designations

2 interviews found

Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Identify the piping symbols & isometric drawing detailing
  • Ans. 

    Piping symbols are graphical representations of pipes, valves, fittings, and other components used in piping systems. Isometric drawings provide a 3D view of the piping system.

    • Piping symbols include straight pipes, elbows, tees, reducers, valves, and pumps

    • Isometric drawings show the piping system in 3D with dimensions and annotations

    • Symbols and isometric drawings are used to communicate design and construction details

  • Answered by AI
  • Q2. How will you choose the scaffolding?
  • Ans. 

    Scaffolding selection depends on the type of work, height, weight, and duration of use.

    • Assess the type of work to be done

    • Consider the height and weight requirements

    • Evaluate the duration of use

    • Choose the appropriate scaffolding type, such as frame, system, or suspended scaffolding

    • Ensure compliance with safety regulations and standards

  • Answered by AI
  • Q3. How will you install the pipe/equipment material in plant?
  • Ans. 

    The pipe/equipment material is installed in the plant by following a systematic process.

    • First, conduct a thorough analysis of the plant layout and design to determine the optimal location for pipe/equipment installation.

    • Prepare the work area by ensuring it is clean, safe, and free from any obstructions.

    • Inspect the pipe/equipment material for any defects or damage before installation.

    • Use appropriate tools and equipment ...

  • Answered by AI
  • Q4. Wha are the pre shutdown activity?
  • Ans. 

    Pre shutdown activities are the tasks that need to be completed before shutting down a plant or equipment.

    • Preparing the equipment for shutdown

    • Draining and cleaning the equipment

    • Isolating the equipment from the rest of the system

    • Performing necessary maintenance and repairs

    • Removing any hazardous materials

    • Ensuring all safety measures are in place

    • Communicating with all relevant personnel

    • Obtaining necessary permits and appr

  • Answered by AI
  • Q5. What are the shutdown activity
  • Ans. 

    Shutdown activities refer to the planned maintenance or repair work that is carried out on equipment or systems during a shutdown period.

    • Shutdown activities involve shutting down equipment or systems for maintenance or repair work

    • Activities may include inspections, repairs, replacements, and upgrades

    • Shutdowns are typically scheduled in advance to minimize disruption to operations

    • Examples of shutdown activities include ...

  • Answered by AI
  • Q6. Explain about post shutdown
  • Ans. 

    Post shutdown refers to the activities carried out after a plant shutdown to ensure safe and efficient resumption of operations.

    • Post shutdown activities include inspection and testing of equipment, cleaning and maintenance of pipelines, and ensuring compliance with safety regulations.

    • The duration of post shutdown activities depends on the complexity of the plant and the extent of maintenance required.

    • Examples of post s...

  • Answered by AI
  • Q7. Elbow centre calculation
Round 3 - HR 

(2 Questions)

  • Q1. Discussion about previous company experience in oil and gas industry
  • Q2. Discussion about the salary and perks

Interview Preparation Tips

Interview preparation tips for other job seekers - Never come to ISCO, it's a utter waste company with very poor management

Top INTEGRAL SERVICES COMPANY Piping Supervisor Interview Questions and Answers

Q1. How will you install the pipe/equipment material in plant?
View answer (2)

Piping Supervisor Interview Questions asked at other Companies

Q1. If we have to replace bypass valve on top of vessel and plant is running, then how to replace that valve ??
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Electrical Equipment busbar Testing
  • Q2. CRM & IR test
  • Q3. HV cable jointing method
  • Ans. 

    HV cable jointing method involves connecting high voltage cables using specialized techniques and materials.

    • HV cable jointing is typically done using heat shrinkable sleeves or cold shrinkable joints.

    • The joints must be properly insulated to prevent electrical leakage and ensure safety.

    • Specialized tools and equipment are used for cable preparation, insulation, and sealing.

    • Proper training and certification are required f...

  • Answered by AI

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

Interview questions from similar companies

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How do you sale nokia phone to that customer who wants another company
  • Ans. 

    To sell a Nokia phone to a customer who wants another company, highlight Nokia's unique features, benefits, and value proposition.

    • Emphasize Nokia's superior build quality and durability

    • Highlight Nokia's long-lasting battery life and reliable performance

    • Showcase Nokia's user-friendly interface and intuitive features

    • Demonstrate Nokia's exceptional camera capabilities and imaging technology

    • Offer competitive pricing and at

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Not so hard
Just be confident no matter you have experience or not. Tell them that you are greatful to take this opportunity amd make them proud for their decision to keep you in their compan

I applied via Campus Placement and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Coding Test 

1 hour

Round 2 - One-on-one 

(1 Question)

  • Q1. About Ds and Linux commands

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare datastructres and alogorithms and linux commands properly .

I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Basic networking theory like arp, ping, vlans, subnetting
  • Q2. Switching scenarios mostly related to STP
  • Q3. OSI layer based questions. For example, which layer deals with congestion control.
  • Q4. Basics of routing. Ospf n bgp scenarios
  • Q5. One of the challenging cases worked on
  • Ans. 

    Developed a solution for optimizing a complex algorithm for a client in the finance industry

    • Client had a large dataset that needed to be processed quickly

    • Implemented parallel processing to speed up the algorithm

    • Optimized the code to reduce memory usage

    • Collaborated with the client to fine-tune the algorithm for their specific needs

  • Answered by AI
  • Q6. Scenarios questions to check how you would approach a problem and work towards resolution. Like what all information would you ask from the customer to understand the issue and how you would make use of it...

Interview Preparation Tips

Interview preparation tips for other job seekers - Having a concrete networking experience and understanding would help you to crack the interview easily.
The scenarios are not tough and are basically put to check if you know the basics.

I appeared for an interview before May 2021.

Round 1 - Assignment 

(1 Question)

Round duration - 90 Minutes
Round difficulty - Medium

  • Q1. 

    Colorful Knapsack Problem

    You are given a set of 'N' stones, each with a specific weight and color. The goal is to fill a knapsack with exactly 'M' stones, choosing one stone of each color, so that the to...

  • Ans. 

    The goal is to fill a knapsack with exactly 'M' stones, choosing one stone of each color, minimizing the unused capacity.

    • Use dynamic programming to solve this problem efficiently.

    • Create a 2D array to keep track of the minimum unused capacity for each color and weight combination.

    • Iterate through the stones and colors to update the array with the minimum unused capacity.

    • Return the minimum unused capacity from the array a

  • Answered by AI
Round 2 - Face to Face 

Round duration - 24 hours
Round difficulty - Medium

Round 3 - HR 

Round duration - 25 minutes
Round difficulty - Easy

Interview Preparation Tips

Professional and academic backgroundI applied for the job as SDE - 1 in HyderabadEligibility criteriatop 20 students from branch. *greater than 7.5 CGPA (approximation)Dell Technologies interview preparation:Topics to prepare for the interview - OOPs, backend web development using python, Django, web development and machine learningTime required to prepare for the interview - 2 monthsInterview preparation tips for other job seekers

Tip 1 : have basic knowledge of web development
Tip 2 : have in depth understanding of workflow and tech stacks you use in your projects

Application resume tips for other job seekers

Tip 1 : mention the skills you are comfortable to answer questions on
Tip 2 : have some projects with clear mention of your contribution to it on resume.

Final outcome of the interviewSelected

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. Car specification
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Most relevant question is Define your self.i think this is opportunity to show yourself.

Round 3 - Assignment 

They said to sell a pen.
I told him advantage & how can this will work. I told as per my knowledge.

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence should always high. Show ,what is special in you.How you are better than others.

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. 1. What is Networking? 2. Questions and programs from C concepts (Arrays, function pointers, Bitwise Operators, Files, Storage classes, Memory allocation, String Operations) ? 3. To write programs fro...
  • Q2. 4. STA connection procedure to an Accesspoint 5. Authentication Methods (WPA/WPA2/WPA3, WEP) 6. Four-Way-Handshake process 7. Wi-Fi spec standards (11ac,ax,g,n) 8. Wi-Fi Roaming

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the concepts, it is easy to crack the interview.

I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. I was asked, about my family, past experiences , business knowledge and basic ideas upon macro and micro economics.

Interview Preparation Tips

Interview preparation tips for other job seekers - From my personal experienc i suggest the applicant to gain some basic knowledge about your job and face the interview with active and confident.

INTEGRAL SERVICES COMPANY Interview FAQs

How many rounds are there in INTEGRAL SERVICES COMPANY interview?
INTEGRAL SERVICES COMPANY interview process usually has 2 rounds. The most common rounds in the INTEGRAL SERVICES COMPANY interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in INTEGRAL SERVICES COMPANY interview?

Some of the top questions asked at the INTEGRAL SERVICES COMPANY interview -

  1. How will you install the pipe/equipment material in pla...read more
  2. Identify the piping symbols & isometric drawing detail...read more
  3. How will you choose the scaffoldi...read more

Tell us how to improve this page.

INTEGRAL SERVICES COMPANY Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more

Interview Questions from Similar Companies

UST Interview Questions
3.8
 • 511 Interviews
Dell Interview Questions
4.0
 • 386 Interviews
Nokia Interview Questions
4.1
 • 267 Interviews
John Deere Interview Questions
4.1
 • 232 Interviews
VVDN Technologies Interview Questions
3.6
 • 198 Interviews
Vivo Interview Questions
4.1
 • 196 Interviews
Mankind Pharma Interview Questions
3.9
 • 193 Interviews
Sodexo Interview Questions
4.1
 • 162 Interviews
View all

INTEGRAL SERVICES COMPANY Reviews and Ratings

based on 57 reviews

3.5/5

Rating in categories

3.3

Skill development

3.6

Work-life balance

3.4

Salary

3.8

Job security

2.9

Company culture

3.1

Promotions

3.4

Work satisfaction

Explore 57 Reviews and Ratings
Piping Supervisor
7 salaries
unlock blur

₹6 L/yr - ₹14.4 L/yr

Instrumentation Supervisor
5 salaries
unlock blur

₹11.4 L/yr - ₹15 L/yr

Mechanical Supervisor
5 salaries
unlock blur

₹8.4 L/yr - ₹15 L/yr

Safety Officer
5 salaries
unlock blur

₹1.1 L/yr - ₹6.8 L/yr

Electrical Supervisor
5 salaries
unlock blur

₹6 L/yr - ₹21.2 L/yr

Explore more salaries
Compare INTEGRAL SERVICES COMPANY with

UST

3.8
Compare

Vivo

4.1
Compare

Dell

3.9
Compare

Hyundai Motor India Limited

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview