Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There were 3 interview rounds.
Types of concrete include ready-mix, precast, shotcrete, high-strength, and lightweight concrete.
Ready-mix concrete is produced in a plant and delivered to the construction site in a truck.
Precast concrete is cast in a reusable mold and cured in a controlled environment before being transported to the construction site.
Shotcrete is a method of applying concrete through a hose and nozzle, often used for vertical or over...
Formwork is a temporary structure used in construction to support and mold concrete until it sets.
Formwork is typically made of wood, steel, or plastic materials.
It is used to create the desired shape and structure of concrete elements such as walls, columns, and slabs.
Formwork must be strong enough to support the weight of the wet concrete and any additional loads.
Once the concrete has set, the formwork is removed to ...
Elevation of a given plan involves creating a vertical view of the plan to show the height of various elements.
To create an elevation, identify the key elements in the plan that need to be shown in height.
Use lines and shading to represent the height of walls, windows, doors, and other features.
Include measurements and annotations to provide detailed information about the elevation.
Consider the scale and perspective wh...
The section of a given plan refers to a specific area or portion of the overall plan.
Identify the boundaries and dimensions of the section
Understand the purpose or function of the section within the plan
Consider how the section interacts with other parts of the plan
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance.
Scaffolding provides a safe working platform at heights.
It is commonly made of metal or wood.
Different types of scaffolding include tube and coupler, frame, and system scaffolding.
Scaffolding must be inspected regularly to ensure safety.
Examples of scaffolding use include building construction, painting, and ma
Shuttering is a temporary structure used in construction to support and shape concrete until it hardens.
Shuttering is also known as formwork.
It can be made of wood, steel, or plastic.
Shuttering is essential for creating the desired shape and structure of concrete elements like walls, columns, and beams.
Once the concrete has hardened, the shuttering is removed to reveal the finished product.
Top trending discussions
I applied via Job Fair and was interviewed before May 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2021. There were 4 interview rounds.
I have an intermediate skill level in shell casting.
I have experience in creating shell molds using different materials such as ceramic, resin, and plaster.
I am familiar with the process of pouring molten metal into the shell mold and the subsequent cooling and solidification process.
I have worked on projects that required precision and accuracy in shell casting, such as creating intricate metal parts for aerospace app...
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
n-tier architecture is a software design pattern that divides an application into logical layers.
It separates presentation, application processing, and data management functions.
Each layer can be developed and maintained independently.
Examples include 3-tier and 4-tier architectures.
It improves scalability, maintainability, and flexibility of the application.
C is a general-purpose programming language known for its efficiency and low-level memory manipulation capabilities.
C was developed by Dennis Ritchie at Bell Labs in 1972.
It is widely used for system programming, embedded systems, and developing operating systems.
C is a compiled language and is known for its speed and efficiency.
It has influenced many other programming languages, including C++, Java, and Python.
Some po...
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
Main challenges faced in GCP implementation
Data migration and integration with existing systems
Ensuring security and compliance with regulations
Optimizing costs and managing resources effectively
Training and upskilling employees to use GCP effectively
Choosing the right services and configurations for specific use cases
Best practices for BigQuery include optimizing queries, managing costs, and securing data.
Optimize queries by using partitioning, clustering, and caching
Manage costs by using cost controls, monitoring usage, and optimizing storage
Secure data by using IAM roles, encryption, and audit logs
I applied via Campus Placement and was interviewed before Apr 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Production Engineer
24
salaries
| ₹2.2 L/yr - ₹5.4 L/yr |
Accounts Officer
10
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
Accountant
9
salaries
| ₹2.4 L/yr - ₹3.1 L/yr |
Plant Head
8
salaries
| ₹7.6 L/yr - ₹16 L/yr |
Junior Accountant
7
salaries
| ₹2.2 L/yr - ₹3.1 L/yr |
TCS
Accenture
Wipro
Cognizant