Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There were 3 interview rounds.
Types of concrete include ready-mix, precast, shotcrete, high-strength, and lightweight concrete.
Ready-mix concrete is produced in a plant and delivered to the construction site in a truck.
Precast concrete is cast in a reusable mold and cured in a controlled environment before being transported to the construction site.
Shotcrete is a method of applying concrete through a hose and nozzle, often used for vertical or over...
Formwork is a temporary structure used in construction to support and mold concrete until it sets.
Formwork is typically made of wood, steel, or plastic materials.
It is used to create the desired shape and structure of concrete elements such as walls, columns, and slabs.
Formwork must be strong enough to support the weight of the wet concrete and any additional loads.
Once the concrete has set, the formwork is removed to ...
Elevation of a given plan involves creating a vertical view of the plan to show the height of various elements.
To create an elevation, identify the key elements in the plan that need to be shown in height.
Use lines and shading to represent the height of walls, windows, doors, and other features.
Include measurements and annotations to provide detailed information about the elevation.
Consider the scale and perspective wh...
The section of a given plan refers to a specific area or portion of the overall plan.
Identify the boundaries and dimensions of the section
Understand the purpose or function of the section within the plan
Consider how the section interacts with other parts of the plan
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance.
Scaffolding provides a safe working platform at heights.
It is commonly made of metal or wood.
Different types of scaffolding include tube and coupler, frame, and system scaffolding.
Scaffolding must be inspected regularly to ensure safety.
Examples of scaffolding use include building construction, painting, and ma
Shuttering is a temporary structure used in construction to support and shape concrete until it hardens.
Shuttering is also known as formwork.
It can be made of wood, steel, or plastic.
Shuttering is essential for creating the desired shape and structure of concrete elements like walls, columns, and beams.
Once the concrete has hardened, the shuttering is removed to reveal the finished product.
I have worked at multiple construction companies as a Planning Engineer.
Worked at ABC Construction Company for 3 years
Managed project schedules and timelines
Collaborated with project managers and stakeholders
Utilized planning software such as Primavera P6
I have 5 years of experience working as a Planning Engineer in the construction industry.
Managed project schedules and timelines
Coordinated with project team members to ensure deadlines were met
Utilized software such as Primavera P6 for project planning
Analyzed project risks and developed mitigation strategies
Prepared progress reports for stakeholders
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Job Portal and was interviewed before Mar 2023. There was 1 interview round.
Dec Industries interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 6 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
based on 3 interviews
Interview experience
based on 49 reviews
Rating in categories
Production Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Head
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Accountant
7
salaries
| ₹0 L/yr - ₹0 L/yr |
TCS
Accenture
Wipro
Cognizant