Filter interviews by
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
I was interviewed before Mar 2024.
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 3 interview rounds.
Dar Al Handasah Consultants Shair And Partners interview questions for popular designations
Top trending discussions
posted on 28 Jul 2022
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
The process to build an Etabs model involves defining the geometry, assigning properties and loads, and analyzing the structure.
Define the geometry of the structure using nodes, lines, and areas
Assign properties to the elements such as material type, section size, and boundary conditions
Apply loads to the structure such as dead loads, live loads, and seismic loads
Analyze the structure using the software's analysis tool...
Lateral forces in a building flow from the top to the bottom through the structural system.
Lateral forces are caused by wind, earthquakes, and other external factors.
The building's structural system, including walls, columns, and beams, must be designed to resist these forces.
The lateral forces are transferred from the top of the building to the foundation through the structural system.
The foundation must be designed t...
posted on 19 Jul 2023
Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.
Copy monitor allows users to track changes in linked models and update them in the current model.
It helps maintain consistency between different models in a project.
Users can easily identify and resolve conflicts or discrepancies between linked models.
Copy monitor can be used for elements like g
Shared parameter is a parameter that can be used across multiple elements in a project.
Shared parameters allow for consistent data across different elements in a project.
They can be created and managed in software like Revit for BIM projects.
Examples include shared parameters for material types, cost estimates, or project phases.
Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.
Import CAD creates a duplicate of the CAD file within the project, increasing file size.
Link CAD maintains a connection to the original CAD file, allowing for real-time updates.
Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.
Import CAD...
Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.
BIM is a collaborative process that allows multiple stakeholders to work together on a building project.
It involves creating and managing digital representations of the physical and functional characteristics of a building.
BIM helps in improving coordination, efficiency, and accuracy in the desi...
I am familiar with a variety of landscape materials such as stone, wood, plants, and water features.
Stone - used for pathways, walls, and decorative elements
Wood - commonly used for decks, fences, and pergolas
Plants - including trees, shrubs, flowers, and grasses for landscaping
Water features - such as ponds, fountains, and streams
I applied via Job Portal and was interviewed before Feb 2023. There were 2 interview rounds.
posted on 19 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Aptitude test in which they will ask you reasoning, aptitude and English
Bending moment diagram (BMD) for a simply supported beam with a point load at the center is a triangular shape.
BMD starts from zero at the supports and reaches maximum at the point load location.
The BMD then decreases back to zero at the other support.
The shape of the BMD is triangular in this case.
The maximum BMD value occurs at the point load location.
Fixed beam end moment for point load at center is half of the point load times the span length.
Fixed beam end moment for point load at center is calculated as half of the point load times the span length
This is applicable for a simply supported beam with a point load applied at the center
The formula for fixed beam end moment for point load at center is M = (wL^2)/8, where M is the moment, w is the point load, and L is
posted on 29 Dec 2023
Some of the top questions asked at the Dar Al Handasah Consultants Shair And Partners interview for experienced candidates -
based on 4 interviews
Interview experience
based on 107 reviews
Rating in categories
Architect
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Interior Architect
17
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
Ramboll
TCE