Filter interviews by
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
RCA methods involve identifying root causes of issues and working with suppliers on part development.
Utilize RCA methods such as 5 Whys or Fishbone Diagram to identify root causes of part development issues
Collaborate with suppliers to address and resolve identified root causes
Communicate effectively with suppliers to ensure alignment on part development goals and timelines
Regularly review progress and make adjustments
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Job Portal and was interviewed before May 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
I was interviewed before Jan 2024.
The question is asking about the candidate's last drawn salary (CTC).
CTC stands for Cost to Company and refers to the total salary package of an employee including all benefits and perks.
The candidate should provide the exact amount or range of their last drawn CTC.
It is important to be honest and transparent about the last CTC to negotiate effectively for the new role.
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
My expected CTC is in line with industry standards for a Sr. Engineer role.
Research industry standards for Sr. Engineer roles in the current market
Consider my years of experience, skills, and qualifications when determining my expected CTC
Be open to negotiation based on the overall compensation package offered
Star-Delta wiring diagram involves connecting a motor in two different configurations for starting and running.
Star connection involves connecting all three terminals of the motor windings together to form a star shape.
Delta connection involves connecting the terminals in a triangular shape.
Switching between star and delta configurations is done using a special motor starter.
Star-Delta wiring is commonly used for reduc...
Star-delta ladder logic is used to control the starting method of a three-phase induction motor.
Use two sets of contactors to switch between star and delta connections.
Implement a timer to delay the transition from star to delta.
Include overload protection for the motor.
Ensure proper interlocking to prevent simultaneous connection of star and delta.
Test the ladder logic thoroughly before implementation.
Some of the top questions asked at the Daimler Lead Design Engineer interview -
based on 1 interview
Interview experience
Senior Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Consultant
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Mahindra & Mahindra
Ashok Leyland
Maruti Suzuki