Filter interviews by
Clear (1)
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2022. There were 5 interview rounds.
I have 5 years of experience as a Project Manager in the IT industry.
Managed multiple projects simultaneously
Led cross-functional teams to successful project completion
Implemented Agile methodologies for project management
Collaborated with stakeholders to define project scope and objectives
Pile works involve driving piles into the ground to provide foundation support. Pile cap works are used to distribute loads from the structure to the piles. Steel and PEB structures are types of building frameworks, with PEB being pre-engineered. Structural design involves creating plans for the building's framework and support system.
Pile works involve driving piles (concrete, steel, timber) into the ground to support...
Top trending discussions
posted on 24 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2023. There was 1 interview round.
If clients are unable to prioritize work, the project manager can use various techniques to prioritize tasks.
Assess the impact and urgency of each task
Consider the project objectives and deliverables
Consult with the project team and stakeholders
Use prioritization techniques like the MoSCoW method or the Eisenhower Matrix
Allocate resources based on priority
Regularly review and adjust priorities as needed
MOSCOW is a prioritization technique used in project management to categorize requirements based on their importance.
MOSCOW stands for Must have, Should have, Could have, and Won't have
It helps in identifying the critical requirements and prioritizing them accordingly
Must have requirements are essential and cannot be compromised, while Won't have requirements are not necessary
For example, in a software development proj...
Invest is the act of allocating resources, usually money, with the expectation of generating an income or profit.
Investing involves taking risks in order to potentially earn a return on your investment.
There are many different types of investments, including stocks, bonds, real estate, and commodities.
Investing requires careful research and analysis to make informed decisions.
Diversification is important to minimize ri...
The OSI model consists of 7 layers that define the functions of a network communication system.
Physical layer - deals with physical connections and signals
Data link layer - handles error detection and correction
Network layer - responsible for routing and addressing
Transport layer - ensures reliable data transfer
Session layer - manages communication sessions
Presentation layer - translates data into a readable format
Appl
I applied via Other and was interviewed before Mar 2018. There were 3 interview rounds.
The question is unclear and lacks context.
Request clarification on what is meant by 'transfer customer'
Ask for more information about the specific role and responsibilities of an Assistant Manager
Seek clarification on the purpose or objective behind the question
posted on 22 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.
posted on 30 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
I am currently monitoring a data center with a total IT load of 500 kW. The equivalent installed in the battery room for Hydrogen sensing is 50 sensors. We use a setup with a neutral breaker to ensure safety. UPS is loaded up to 80% capacity for optimal performance. Consumables are managed efficiently to reduce waste. The total buildup area I am managing is 10,000 square feet.
IT load of data center: 500 kW
Equivalent in...
Managing chiller plant involves understanding the chiller cycle, as well as the functions of turbocharger and governor in DG sets.
Chiller plant management involves monitoring and controlling the chiller cycle to ensure efficient cooling of a building or facility.
The chiller cycle consists of four main components: evaporator, compressor, condenser, and expansion valve. Refrigerant circulates through these components to ...
I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.
DWDM stands for Dense Wavelength Division Multiplexing and SDH stands for Synchronous Digital Hierarchy. Knowledge of these equipments is essential for managing network infrastructure.
DWDM is a technology that multiplexes multiple optical carrier signals on a single optical fiber by using different wavelengths of laser light.
SDH is a standardized multiplexing protocol used to transfer data over optical fibers.
Understan...
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 2 interview rounds.
Some of the top questions asked at the CtrlS Project Manager interview -
based on 3 interviews
Interview experience
based on 5 reviews
Rating in categories
Associate Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Manager
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Program Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Network Security Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Web Werks
Sify Technologies
Nxtgen Datacenter Cloud Technologies
STT Global Data Centres India