Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2023. There were 6 interview rounds.
Testing procedures for piping and duct involve pressure testing, leak testing, and visual inspection.
Pressure testing involves pressurizing the system with air or water to check for leaks.
Leak testing can be done using soap solution or electronic leak detectors.
Visual inspection includes checking for proper installation, support, and connections.
Testing procedures should follow industry standards and regulations.
Docume...
Fire pump room is designed to provide water supply at high pressure to the sprinkler system in case of fire emergency.
Fire pump room houses pumps that are capable of delivering water at high pressure to the sprinkler system
The pumps are usually powered by electricity or diesel engines
The room is equipped with controllers and alarms to monitor and control the water flow
Regular maintenance and testing of the pumps are es...
Insulation material specification includes type, thickness, density, and thermal conductivity.
Specify the type of insulation material (e.g. fiberglass, foam, mineral wool)
Provide the thickness of the insulation material in inches or millimeters
Include the density of the insulation material in pounds per cubic foot or kilograms per cubic meter
State the thermal conductivity of the insulation material in BTU/(hr*ft*F) or
Top trending discussions
I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2023. There was 1 interview round.
If clients are unable to prioritize work, the project manager can use various techniques to prioritize tasks.
Assess the impact and urgency of each task
Consider the project objectives and deliverables
Consult with the project team and stakeholders
Use prioritization techniques like the MoSCoW method or the Eisenhower Matrix
Allocate resources based on priority
Regularly review and adjust priorities as needed
MOSCOW is a prioritization technique used in project management to categorize requirements based on their importance.
MOSCOW stands for Must have, Should have, Could have, and Won't have
It helps in identifying the critical requirements and prioritizing them accordingly
Must have requirements are essential and cannot be compromised, while Won't have requirements are not necessary
For example, in a software development proj...
Invest is the act of allocating resources, usually money, with the expectation of generating an income or profit.
Investing involves taking risks in order to potentially earn a return on your investment.
There are many different types of investments, including stocks, bonds, real estate, and commodities.
Investing requires careful research and analysis to make informed decisions.
Diversification is important to minimize ri...
As a Project Manager, day to day activities include overseeing project progress, communicating with team members and stakeholders, resolving issues, and tracking deadlines.
Communicating with team members and stakeholders to provide updates and gather feedback
Monitoring project progress and ensuring tasks are completed on time
Identifying and resolving any issues or roadblocks that may arise
Tracking deadlines and ensurin...
I am highly skilled in communication, with experience in leading project teams and effectively conveying information.
I have experience leading project teams and effectively conveying information
I am skilled in written and verbal communication
I am able to tailor my communication style to different audiences
I have experience in conflict resolution and negotiation
Database is a structured collection of data, scaling refers to increasing capacity to handle more data or users.
Database is a structured collection of data organized for easy access, retrieval, and management
Scaling refers to the ability of a system to handle increased workload or growth
Scaling can involve adding more servers, increasing storage capacity, or optimizing performance
Examples of scaling in databases includ...
I applied via Referral and was interviewed before Jun 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Associate Engineer
80
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Shift Manager
65
salaries
| ₹7.1 L/yr - ₹17 L/yr |
Assistant Manager
60
salaries
| ₹6.8 L/yr - ₹20 L/yr |
Program Manager
51
salaries
| ₹5.8 L/yr - ₹23.1 L/yr |
Network Security Engineer
50
salaries
| ₹3.5 L/yr - ₹10.4 L/yr |
ITC Infotech
CMS IT Services
KocharTech
Xoriant