I applied via Naukri.com and was interviewed in Jan 2023. There were 6 interview rounds.
Testing procedures for piping and duct involve pressure testing, leak testing, and visual inspection.
Pressure testing involves pressurizing the system with air or water to check for leaks.
Leak testing can be done using soap solution or electronic leak detectors.
Visual inspection includes checking for proper installation, support, and connections.
Testing procedures should follow industry standards and regulations.
Docume...
Fire pump room is designed to provide water supply at high pressure to the sprinkler system in case of fire emergency.
Fire pump room houses pumps that are capable of delivering water at high pressure to the sprinkler system
The pumps are usually powered by electricity or diesel engines
The room is equipped with controllers and alarms to monitor and control the water flow
Regular maintenance and testing of the pumps are es...
Insulation material specification includes type, thickness, density, and thermal conductivity.
Specify the type of insulation material (e.g. fiberglass, foam, mineral wool)
Provide the thickness of the insulation material in inches or millimeters
Include the density of the insulation material in pounds per cubic foot or kilograms per cubic meter
State the thermal conductivity of the insulation material in BTU/(hr*ft*F) or
Top trending discussions
posted on 24 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2023. There was 1 interview round.
If clients are unable to prioritize work, the project manager can use various techniques to prioritize tasks.
Assess the impact and urgency of each task
Consider the project objectives and deliverables
Consult with the project team and stakeholders
Use prioritization techniques like the MoSCoW method or the Eisenhower Matrix
Allocate resources based on priority
Regularly review and adjust priorities as needed
MOSCOW is a prioritization technique used in project management to categorize requirements based on their importance.
MOSCOW stands for Must have, Should have, Could have, and Won't have
It helps in identifying the critical requirements and prioritizing them accordingly
Must have requirements are essential and cannot be compromised, while Won't have requirements are not necessary
For example, in a software development proj...
Invest is the act of allocating resources, usually money, with the expectation of generating an income or profit.
Investing involves taking risks in order to potentially earn a return on your investment.
There are many different types of investments, including stocks, bonds, real estate, and commodities.
Investing requires careful research and analysis to make informed decisions.
Diversification is important to minimize ri...
The OSI model consists of 7 layers that define the functions of a network communication system.
Physical layer - deals with physical connections and signals
Data link layer - handles error detection and correction
Network layer - responsible for routing and addressing
Transport layer - ensures reliable data transfer
Session layer - manages communication sessions
Presentation layer - translates data into a readable format
Appl
I applied via Company Website and was interviewed before Aug 2021. There were 2 interview rounds.
The backup port number for SQL is 1433.
The default backup port number for SQL is 1433.
This port number can be changed during installation or configuration.
It is important to ensure that the backup port is open and accessible for backup and restore operations.
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Hacker rank test was given. 30 mcq and 1 coding test. Test duration is 1 hour. Core java and spring boot questions were covered.
I applied via Naukri.com and was interviewed in Nov 2020. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Associate Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Manager
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Program Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Network Security Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Web Werks
Sify Technologies
Nxtgen Datacenter Cloud Technologies
STT Global Data Centres India