I applied via campus placement at National Institute of Technology (NIT), Hamirpur and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Round 1 was a online test on Microsoft forms, 50 questions were there to be done in 60 minutes, consist of quantitative and verbal aptitude and subject matter.
The cutoff for civil engineering was 40/50, you can qualify this test, if you are giving placement tests seriously.

Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated Civil Engineer with a passion for designing and constructing sustainable infrastructure.

    • Graduated with a degree in Civil Engineering from XYZ University

    • Experienced in designing and managing construction projects

    • Skilled in using AutoCAD and other engineering software

    • Strong understanding of structural analysis and building codes

    • Completed internships at construction firms like ABC Construction

  • Answered by AI
  • Q2. Questions on final year project.
  • Q3. Favorite subject and basic questions on that, The main thing that is being taken care of is to communicate well and discuss the question, not just give answer.
Round 3 - HR 

(1 Question)

  • Q1. Just a talk, just be expressive and cool.

Interview Preparation Tips

Topics to prepare for Techno Electric & Engineering Company Civil Engineer interview:
  • Structure
  • Strength of materials
  • Building Materials and construction
  • Pile Foundation
Interview preparation tips for other job seekers - Be cool, be prepared and confident and have faith in God.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Calculating Bbs for column
  • Ans. 

    Calculating BBS for columns involves determining the quantity and spacing of reinforcement bars.

    • Calculate the total length of reinforcement bars required for the column

    • Determine the spacing between the bars based on design requirements

    • Consider the diameter and spacing of the bars to ensure proper structural integrity

    • Use software or manual calculations to determine the BBS accurately

  • Answered by AI
  • Q2. Mix ratios of concrete
  • Ans. 

    Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

    • Mix ratios are typically expressed as a series of numbers representing the amount of each ingredient in the mix.

    • For example, a common mix ratio for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.

    • The mix ratio can vary depending on the strength and durability requirements of the concre...

  • Answered by AI
  • Q3. Difference between design mix and std mix concrete
  • Ans. 

    Design mix concrete is prepared as per the mix design provided by a structural engineer, while standard mix concrete follows a standard ratio of ingredients.

    • Design mix concrete is customized based on specific project requirements and strength criteria.

    • Standard mix concrete follows a fixed ratio of cement, sand, and aggregates, such as 1:2:4.

    • Design mix concrete may require testing and adjustments to achieve desired prop...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is firewall
  • Ans. 

    A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.

    • Acts as a barrier between a trusted internal network and untrusted external network

    • Filters network traffic based on rules set by the administrator

    • Can be hardware-based or software-based

    • Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall

  • Answered by AI
  • Q2. Cyber security related questions

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a dedicated and detail-oriented PMO Analyst with a strong background in project management and data analysis.

    • I have a Bachelor's degree in Business Administration with a focus on project management.

    • I have experience in creating and maintaining project plans, tracking project progress, and analyzing project data.

    • I am proficient in using project management tools such as Microsoft Project and Jira.

    • I have excellent co...

  • Answered by AI
  • Q2. Tell me project you handled
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Knowledge of store
  • Q2. Work experience
Round 2 - One-on-one 

(3 Questions)

  • Q1. Background knowledge
  • Q2. Experience of plant materials
  • Ans. 

    I have 5 years of experience handling and managing plant materials in a warehouse setting.

    • Managed inventory of plant materials including seeds, fertilizers, and pesticides

    • Ensured proper storage conditions to maintain quality and prevent spoilage

    • Implemented inventory tracking systems to monitor stock levels and reorder supplies as needed

    • Collaborated with suppliers to ensure timely delivery of plant materials

    • Performed re...

  • Answered by AI
  • Q3. Stocks material
Round 3 - Group Discussion 

Strore group comunication

Round 4 - Technical 

(2 Questions)

  • Q1. Material handling manufacturing iron and steel
  • Q2. My work knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge plants material handling manufacturing process production industry and iron and steel
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Practical questions on switchyard test
Round 2 - One-on-one 

(1 Question)

  • Q1. Questions on Preview experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Location is bad , client end also stick
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is FIDIC contract ?
  • Ans. 

    FIDIC contract is a standard form of contract used in the construction industry.

    • FIDIC stands for International Federation of Consulting Engineers.

    • It provides a framework for the rights and obligations of parties involved in construction projects.

    • Commonly used in international construction projects.

    • Includes different types of contracts such as Red Book, Yellow Book, and Silver Book.

  • Answered by AI
  • Q2. What is variation?
  • Ans. 

    Variation refers to the degree of difference or deviation from a standard or expected value.

    • Variation can be caused by factors such as changes in materials, labor costs, or market conditions.

    • It is important for cost managers to analyze variation in order to understand the reasons behind cost fluctuations.

    • Examples of variation include price changes for raw materials, unexpected delays in project timelines, and fluctuati

  • Answered by AI
  • Q3. What is GCC and SCC?
  • Ans. 

    GCC stands for Guaranteed Cost Contract and SCC stands for Self-Insured Retention Contract in construction projects.

    • GCC is a type of contract where the contractor is paid a fixed amount regardless of the actual project costs.

    • SCC is a type of contract where the contractor is responsible for a certain amount of project costs before insurance coverage kicks in.

    • GCC provides cost certainty for the project owner while SCC ma...

  • Answered by AI
  • Q4. What is MIS?can you prepare?
  • Ans. 

    MIS stands for Management Information System, which is a computerized database that collects, processes, and presents information to support decision-making.

    • MIS helps in organizing and analyzing data to provide managers with information needed for decision-making.

    • It includes software systems, hardware, procedures, and people involved in the collection, processing, and dissemination of information.

    • Examples of MIS includ...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. What is the requirement of testing for equipments?
  • Ans. 

    Testing is necessary to ensure the proper functioning, safety, and reliability of electrical equipment.

    • Testing helps identify any faults or defects in the equipment.

    • It ensures that the equipment meets the required standards and specifications.

    • Testing helps prevent accidents and ensures the safety of users.

    • Regular testing helps in detecting any potential issues before they become major problems.

    • It helps in maintaining t...

  • Answered by AI
  • Q2. What is the safety awareness?
  • Ans. 

    Safety awareness is the understanding and knowledge of potential hazards and the importance of taking precautions to prevent accidents or injuries.

    • Safety awareness involves being aware of potential hazards in the workplace or environment.

    • It includes understanding safety procedures and protocols.

    • It involves recognizing and reporting unsafe conditions or behaviors.

    • Safety awareness also includes promoting a safety culture...

  • Answered by AI
  • Q3. Explain the responsibility of your previous company.
  • Q4. What is the shutdown process?
  • Ans. 

    The shutdown process refers to the systematic procedure followed to safely stop and deactivate electrical systems or equipment.

    • The shutdown process involves identifying the equipment to be shut down and ensuring proper isolation from power sources.

    • It may include following specific procedures provided by equipment manufacturers or industry standards.

    • Shutdown procedures often involve turning off power supply, closing val...

  • Answered by AI
  • Q5. What is the shutdown process
  • Ans. 

    The shutdown process refers to the systematic procedure followed to safely stop and deactivate electrical systems or equipment.

    • The shutdown process involves proper planning and coordination to ensure the safety of personnel and equipment.

    • It typically includes steps such as isolating power sources, securing equipment, and performing necessary maintenance or repairs.

    • Examples of shutdown processes can vary depending on th...

  • Answered by AI
  • Q6. Explain the string rectification and fault founding.
  • Ans. 

    String rectification is the process of correcting faults in electrical circuits by identifying and fixing the faulty components.

    • String rectification involves troubleshooting electrical circuits to identify faults.

    • Once the faults are identified, the faulty components are repaired or replaced.

    • Common faults in electrical circuits include short circuits, open circuits, and faulty components.

    • Fault finding is a systematic pr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You should always good knowledge and better skills.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Work experience
  • Q2. Which state you belong
  • Ans. 

    I belong to the state of California.

    • I am a native of California.

    • I have lived in California for most of my life.

    • I completed my education in California, including my engineering degree.

    • I have worked on various construction projects in California.

    • I am familiar with the building codes and regulations specific to California.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep working and believe in your self

Conart Engineers Interview FAQs

How to prepare for Conart Engineers interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Conart Engineers. The most common topics and skills that interviewers at Conart Engineers expect are Communication Skills, Government Relations, Legal Compliance, Policies and Relationship Management.

Tell us how to improve this page.

Conart Engineers Reviews and Ratings

based on 8 reviews

4.2/5

Rating in categories

4.9

Skill development

4.2

Work-Life balance

3.4

Salary & Benefits

4.6

Job Security

4.8

Company culture

3.7

Promotions/Appraisal

4.9

Work Satisfaction

Explore 8 Reviews and Ratings
Civil Site Engineer
7 salaries
unlock blur

₹3 L/yr - ₹4.6 L/yr

Site Incharge
4 salaries
unlock blur

₹6.2 L/yr - ₹6.2 L/yr

Safety Officer
4 salaries
unlock blur

₹3.6 L/yr - ₹4 L/yr

Civil Supervisor
4 salaries
unlock blur

₹2.5 L/yr - ₹3 L/yr

Project Coordinator
3 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

Explore more salaries
Compare Conart Engineers with

GAMMON INDIA

3.9
Compare

McNally Bharat Engineering

4.1
Compare

SPML Infra

3.5
Compare

Techno Electric & Engineering Company

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview