Calculating BBS for columns involves determining the quantity and spacing of reinforcement bars.
Calculate the total length of reinforcement bars required for the column
Determine the spacing between the bars based on design requirements
Consider the diameter and spacing of the bars to ensure proper structural integrity
Use software or manual calculations to determine the BBS accurately
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a series of numbers representing the amount of each ingredient in the mix.
For example, a common mix ratio for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.
The mix ratio can vary depending on the strength and durability requirements of the concre...
Design mix concrete is prepared as per the mix design provided by a structural engineer, while standard mix concrete follows a standard ratio of ingredients.
Design mix concrete is customized based on specific project requirements and strength criteria.
Standard mix concrete follows a fixed ratio of cement, sand, and aggregates, such as 1:2:4.
Design mix concrete may require testing and adjustments to achieve desired prop...
Top trending discussions
Variation procedure involves documenting and managing changes to the scope of work in a construction project.
Variations should be documented in writing with clear details of the change.
Cost implications of variations should be assessed and agreed upon by all parties involved.
Variation procedure should be outlined in the contract to avoid disputes.
Regular communication and collaboration between the quantity surveyor, cl...
PC adjustment refers to the adjustment of the Preliminary Costs in a construction project.
PC adjustment involves reviewing and updating the initial cost estimates for items such as site preparation, temporary works, and design fees.
Changes in project scope, design modifications, or unforeseen site conditions may necessitate PC adjustments.
PC adjustments are typically made during the pre-construction phase to ensure acc...
Variation procedure involves documenting and managing changes to the scope of work in a construction project.
Variations should be documented in writing with clear details of the change.
Cost implications of variations should be assessed and agreed upon by all parties involved.
Variation procedure should be outlined in the contract to avoid disputes.
Regular communication and collaboration between the quantity surveyor, cl...
PC adjustment refers to the adjustment of the Preliminary Costs in a construction project.
PC adjustment involves reviewing and updating the initial cost estimates for items such as site preparation, temporary works, and design fees.
Changes in project scope, design modifications, or unforeseen site conditions may necessitate PC adjustments.
PC adjustments are typically made during the pre-construction phase to ensure acc...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
82
salaries
| ₹1 L/yr - ₹4.2 L/yr |
Civil Site Engineer
55
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Senior Engineer
17
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Civil Engineer
14
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Site Engineer
12
salaries
| ₹2.5 L/yr - ₹5.1 L/yr |
Nagarjuna Construction Company
Ashoka Buildcon
IRB Infrastructure
Simplex Infrastructures