Upload Button Icon Add office photos

Filter interviews by

Clear (1)

RPP Infra Projects Engineer Interview Questions and Answers

Updated 12 Apr 2021

RPP Infra Projects Engineer Interview Experiences

1 interview found

I applied via Indeed and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basic civil questions
  • Q2. Weight of steel Mix ratio
  • Ans. 

    The weight of steel depends on its volume and density. Mix ratio varies depending on the type of steel.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel varies depending on the type of steel, but is typically around 7.85 g/cm³

    • Mix ratio refers to the proportion of different elements in the steel, such as carbon, manganese, and silicon

    • Different types of steel have diff...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview

Interview questions from similar companies

I was interviewed before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Sir, Can I got Company Details ?
  • Q2. Sir, Can I know Interview process?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
This is with reference to your job requirement the position of SME I am interested in this position and would appreciate your consideration as a candidate for this role. I believe that my skills. qualifications make me a suitable candidate for the job. I'm working @ SAKTHI ASSOCIATES from 2018 June till Know. Currently my project work @EPIL (Engineering Project India Limited) I have completed B.Tech in Civil from Bharath university. I have Experience in Site Engineering 4+ Years . I have Completed project
1.ETP (Effluent Treatment plant )
2.RO ( Reverse Osmosis)
3.Weaving Shead Textile Industry
4.TCL Chinese pvt Ltd
5. Residential building G+ 4
I am confident that my skills will be the right fit for the job Please find the attached CV in the email for further reference.

Thank you for your time and consideration
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Contribute & help others!
anonymous
You can choose to be anonymous

RPP Infra Projects Interview FAQs

What are the top questions asked in RPP Infra Projects Engineer interview?

Some of the top questions asked at the RPP Infra Projects Engineer interview -

  1. Weight of steel Mix ra...read more
  2. Basic civil questi...read more

Recently Viewed

INTERVIEWS

BlackBuck

No Interviews

SALARIES

RPP Infra Projects

SALARIES

Lakshmikumaran & Sridharan

SALARIES

Lakshmikumaran & Sridharan

SALARIES

Shardul Amarchand Mangaldas

SALARIES

Newgen Software Technologies

SALARIES

Lakshmikumaran & Sridharan

SALARIES

RPP Infra Projects

SALARIES

Airports Authority of India

JOBS

RPP Infra Projects

No Jobs

Tell us how to improve this page.

RPP Infra Projects Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

3.0

Salary

3.0

Job security

1.1

Company culture

3.0

Promotions

3.1

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
81 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Site Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare RPP Infra Projects with

Nagarjuna Construction Company

4.1
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview