i
Colliers India
Filter interviews by
I applied via LinkedIn and was interviewed in Mar 2021. There were 3 interview rounds.
Top trending discussions
I applied via LinkedIn and was interviewed before Sep 2023. There was 1 interview round.
Risk assessment is calculated by identifying hazards, evaluating the likelihood and severity of potential harm, and determining risk levels.
Identify hazards present in the workplace or environment
Evaluate the likelihood of those hazards causing harm
Assess the potential severity of harm that could result from the hazards
Determine the risk level by combining likelihood and severity assessments
Use risk assessment tools su...
Daily activities include conducting safety inspections, training employees on safety procedures, investigating incidents, and updating safety policies.
Conduct safety inspections of work areas
Train employees on safety procedures and protocols
Investigate incidents and accidents to determine root causes
Update safety policies and procedures based on findings
Ensure compliance with safety regulations and standards
I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.
HIRA, CORA, Inspection report, and Auditing are all important aspects of safety management in a workplace.
HIRA stands for Hazard Identification and Risk Assessment, which involves identifying potential hazards in the workplace and assessing the risks associated with them.
CORA stands for Consequence of Risk Analysis, which involves analyzing the potential consequences of identified risks.
Inspection reports are documents...
posted on 11 Jan 2024
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
Implementation of EHS at site involves creating policies, conducting training, performing audits, and ensuring compliance.
Developing and implementing EHS policies and procedures
Conducting regular safety training for employees
Performing site audits to identify hazards and risks
Ensuring compliance with local regulations and company standards
Encouraging a culture of safety and reporting near misses or incidents
Check points in Batching Plant include material storage, weighing systems, mixing systems, and delivery systems.
Material storage area should be organized and free from debris to prevent contamination.
Weighing systems should be calibrated regularly to ensure accurate measurements.
Mixing systems should be checked for proper functioning and cleanliness to avoid cross-contamination.
Delivery systems should be inspected for ...
Risk assessment for hazards involves identifying, evaluating, and prioritizing potential risks to prevent accidents and injuries.
Identify potential hazards in the workplace
Evaluate the likelihood and severity of each hazard
Prioritize risks based on the level of risk and potential impact
Implement control measures to mitigate or eliminate hazards
Regularly review and update risk assessments
I was interviewed before Feb 2024.
I have 5 years of experience managing projects in the marketing industry.
Led a team of 10 individuals to successfully launch a new product campaign
Implemented project management software to streamline communication and track progress
Managed a budget of $500,000 for a major rebranding project
I applied via Indeed and was interviewed before Dec 2023. There was 1 interview round.
posted on 6 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
Working on case study home loan
Verbal explanation on case study
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.
Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.
The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.
Aluminium shuttering can be easily assemble...
based on 4 reviews
Rating in categories
Assistant Manager
249
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
145
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
108
salaries
| ₹0 L/yr - ₹0 L/yr |
CBRE
JLL
Cushman & Wakefield
Knight Frank