Filter interviews by
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
Implementation of EHS at site involves creating policies, conducting training, performing audits, and ensuring compliance.
Developing and implementing EHS policies and procedures
Conducting regular safety training for employees
Performing site audits to identify hazards and risks
Ensuring compliance with local regulations and company standards
Encouraging a culture of safety and reporting near misses or incidents
Check points in Batching Plant include material storage, weighing systems, mixing systems, and delivery systems.
Material storage area should be organized and free from debris to prevent contamination.
Weighing systems should be calibrated regularly to ensure accurate measurements.
Mixing systems should be checked for proper functioning and cleanliness to avoid cross-contamination.
Delivery systems should be inspected for ...
Risk assessment for hazards involves identifying, evaluating, and prioritizing potential risks to prevent accidents and injuries.
Identify potential hazards in the workplace
Evaluate the likelihood and severity of each hazard
Prioritize risks based on the level of risk and potential impact
Implement control measures to mitigate or eliminate hazards
Regularly review and update risk assessments
Top trending discussions
I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.
HIRA, CORA, Inspection report, and Auditing are all important aspects of safety management in a workplace.
HIRA stands for Hazard Identification and Risk Assessment, which involves identifying potential hazards in the workplace and assessing the risks associated with them.
CORA stands for Consequence of Risk Analysis, which involves analyzing the potential consequences of identified risks.
Inspection reports are documents...
posted on 11 Jan 2024
I appeared for an interview in Feb 2023.
Self introduction, previous experience of working.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph of shear force plotted against the length of the beam.
Bending moment diagram is a graph of bending moment plotted against the length of the beam.
Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...
Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.
Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.
It includes factors such as type of material, dimensions, quality standards, and wastage allowances.
For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring new opportunities for career advancement.
Seeking a company with a better cultural fit or work-life balance.
Want to work on more innovative projects or in a different industry.
Previous company downsized or restructured, leading to job loss.
I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.
Implemented best practices in engineering processes and project management
Fostered a culture of continuous improvement through regular training and feedback sessions
Ensured alignment with industry standards and certifications such as ISO, ASME, or API
Regul...
I manage projects by setting clear goals, creating a detailed plan, delegating tasks effectively, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed project plan outlining tasks, timelines, and resources
Delegate tasks to team members based on their strengths and expertise
Monitor progress regularly and address any issues or delays promptly
Adjust the project plan
I applied via Job Portal and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 5 Jul 2021
I applied via Walk-in
posted on 12 Jun 2021
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
The sampling frequency for private density test per square meter depends on the type of test being conducted.
The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.
For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...
based on 1 interview
Interview experience
Senior Engineer
501
salaries
| ₹2.8 L/yr - ₹6.2 L/yr |
Project Engineer
458
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
325
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Deputy Manager
209
salaries
| ₹5 L/yr - ₹11 L/yr |
Senior Executive
201
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Godrej Properties
DLF
Surya Roshni
Emaar India Limited