I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Can you prepare BBS?
  • Ans. 

    Yes, I can prepare BBS (Bar Bending Schedule).

    • I have experience in preparing BBS for various projects.

    • I am proficient in using software like AutoCAD and Excel for BBS preparation.

    • I ensure that the BBS is accurate and meets the project requirements.

    • I also coordinate with the site team to ensure timely delivery of BBS.

  • Answered by AI
  • Q2. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
  • Ans. 

    Yes, I am familiar with Rate Analysis. A rate analysis for blockwork involves calculating the cost of materials, labor, and equipment needed for the project.

    • Determine the quantity of materials needed for the blockwork

    • Calculate the cost of materials per unit

    • Estimate the labor cost based on the time required for the project

    • Include equipment costs such as scaffolding and tools

    • Add all costs together to determine the total ...

  • Answered by AI
  • Q3. Are you familiar with item rate billing?
  • Ans. 

    Yes, I am familiar with item rate billing.

    • Item rate billing is a method of billing where each item or service is charged separately.

    • It is commonly used in construction and engineering projects.

    • The rates for each item are pre-determined and agreed upon by both parties.

    • This type of billing allows for greater transparency and accuracy in billing.

    • It also allows for easier tracking of expenses and budgeting.

  • Answered by AI
  • Q4. What do you mean by basic rate variation?
  • Ans. 

    Basic rate variation refers to the change in the standard rate of a particular item or service.

    • It is a change in the standard rate of a particular item or service

    • It can be due to various factors such as inflation, market demand, etc.

    • For example, if the basic rate of a product is $10 and it increases to $12, it is a basic rate variation.

  • Answered by AI
  • Q5. Difference between basic rate variation and rate escalation?
  • Ans. 

    Basic rate variation is due to changes in the scope of work, while rate escalation is due to inflation or market changes.

    • Basic rate variation occurs due to changes in the scope of work, such as additional work or changes in the design.

    • Rate escalation occurs due to inflation or market changes, such as an increase in the cost of materials or labor.

    • Basic rate variation is typically negotiated and agreed upon before the st...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Capacit'e Infraprojects Senior Billing Engineer interview:
  • Rate Analysis
  • BBS
  • AutoCAD
  • Quantity Surveying
Interview preparation tips for other job seekers - The best way to hack any interview is to prepare yourselves un rate analysis, BBS and QS, Autocad & MS office is a must. IS code references for various billing related items.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Billing codes to be followed
  • Ans. 

    Billing codes are determined by the organization and industry standards.

    • Billing codes are used to identify specific products or services provided by an organization.

    • The codes are typically determined by the organization and may also follow industry standards.

    • Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.

  • Answered by AI
  • Q2. IS 1200, it is in different part.

Capacit'e Infraprojects Interview FAQs

How many rounds are there in Capacit'e Infraprojects Senior Billing Engineer interview for experienced candidates?
Capacit'e Infraprojects interview process for experienced candidates usually has 2 rounds. The most common rounds in the Capacit'e Infraprojects interview process for experienced candidates are Resume Shortlist and Technical.
What are the top questions asked in Capacit'e Infraprojects Senior Billing Engineer interview for experienced candidates?

Some of the top questions asked at the Capacit'e Infraprojects Senior Billing Engineer interview for experienced candidates -

  1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockw...read more
  2. What do you mean by basic rate variati...read more
  3. Difference between basic rate variation and rate escalati...read more

Tell us how to improve this page.

Capacit'e Infraprojects Senior Billing Engineer Salary
based on 22 salaries
₹5.2 L/yr - ₹10.2 L/yr
11% more than the average Senior Billing Engineer Salary in India
View more details

Capacit'e Infraprojects Senior Billing Engineer Reviews and Ratings

based on 6 reviews

3.7/5

Rating in categories

3.4

Skill development

2.5

Work-life balance

3.5

Salary

2.3

Job security

3.4

Company culture

2.8

Promotions

3.7

Work satisfaction

Explore 6 Reviews and Ratings
Senior Engineer
164 salaries
unlock blur

₹4 L/yr - ₹9.1 L/yr

Assistant Manager
92 salaries
unlock blur

₹5.8 L/yr - ₹12 L/yr

Civil Site Engineer
63 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Civil Engineer
53 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Junior Engineer
49 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare Capacit'e Infraprojects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview