i
BVG India
Filter interviews by
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
Top trending discussions
Method of estimation refers to the process of calculating the approximate cost of a project or task.
Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.
Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.
Estimation can be done manually or using software such as AutoCAD, Excel...
The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.
Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.
The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...
Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.
Substructure includes foundation, basement, and retaining walls
Superstructure includes columns, beams, walls, and roof
Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure
Examples of substructure ...
based on 3 reviews
Rating in categories
Assistant Manager
90
salaries
| ₹2.6 L/yr - ₹8.1 L/yr |
Supervisor
89
salaries
| ₹1 L/yr - ₹3.5 L/yr |
Housekeeping Supervisor
77
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Facility Manager
51
salaries
| ₹2.6 L/yr - ₹8.6 L/yr |
Communication Officer
47
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Sodexo
Compass Group Support Services
Aramark
Elior