Upload Button Icon Add office photos

Filter interviews by

Brij Gopal Construction Company Planning & Billing Engineer Interview Questions and Answers

Updated 14 Oct 2021

Brij Gopal Construction Company Planning & Billing Engineer Interview Experiences

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Mar 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Formula to find unit weight of circulat bar?
  • Ans. 

    Unit weight of circular bar can be calculated using a specific formula.

    • The formula to find the unit weight of a circular bar is: Unit weight = (π * D^2 * L * ρ) / 4

    • Where D is the diameter of the circular bar, L is the length of the bar, and ρ is the density of the material.

    • Make sure to use consistent units for diameter, length, and density in the formula.

    • For example, if the diameter of the circular bar is 10 mm, the le...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions on yourself and previous organisation
Round 3 - Technical 

(2 Questions)

  • Q1. Question will be asked by you on your applied job profile, for eg if you are applying for billing engineer question will be on billing like what types of billing till you have done like milestone billing, ...
  • Q2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS word &. Power point
Round 4 - Document review 

(1 Question)

  • Q1. What is LD in billing, What is JMR, Mandatory document required for bill to be raised etc
  • Ans. 

    LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.

    • LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.

    • JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions related to core subject and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Questions related to core subjects and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Job insecurity in PMC B+P department .
If you are looking for long term job > i would suggest go for other PMC
Round 1 - Coding Test 

IS 1200

Interview Preparation Tips

Interview preparation tips for other job seekers - I am explaied below the items
1)Plastering deductions as per IS code
2)Shuttering deduction
3)Reconciliation like steel,cement,bulk materials
4)Zero cost
5)taken BBS they given drawing.
6)Slab recycling dates

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is material reconciliation
  • Ans. 

    Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.

    • Involves comparing the actual quantity of materials used in a project with the estimated quantity

    • Helps in identifying any discrepancies or variances in material usage

    • Ensures that the project stays within budget and timelines

    • Can involve physical counting of materials on site or compa...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.

    • Rolling margin helps in determining the profitability of a product or service.

    • It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.

    • For example, if a product is sold for $100 and the cost of goods sold is $60, the ...

  • Answered by AI
  • Q3. How to calculate bend deduction of ring in BBS?
  • Ans. 

    Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.

    • Calculate the bend allowance for each bend in the ring.

    • Add the bend allowances together to get the total bend allowance.

    • Subtract the total bend allowance from the total length of the ring to get the bend deduction.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is bend deduction for ring hook
  • Ans. 

    Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.

    • Bend deduction is calculated based on the material thickness and bend radius.

    • It is used to determine the flat pattern length of the material before bending.

    • For ring hooks, the bend deduction is typically around 1.5 times the material thickness.

    • The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the IS Code of Concrete
  • Ans. 

    IS Code of Concrete is IS 456:2000

    • IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete

    • It provides guidelines for the design and construction of concrete structures

    • The code covers various aspects such as materials, mix design, workmanship, and testing

    • It ensures the quality and durability of concrete structures

    • For example, IS 456:2000 specifies the minimum grade of concrete for different types of str

  • Answered by AI
  • Q2. Concrete IS code is IS 456
  • Ans. 

    IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.

    • IS 456 provides guidelines for the use of reinforced concrete in construction.

    • It covers the general requirements for the design and construction of reinforced concrete structures.

    • The code includes provisions for materials, structural design, durability, and safety.

    • It also provides guidelines for testing and quality cont...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Billing engineer interview is maximum technical questions.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to prepare bbs
  • Q2. How much amount billing you have completed.

I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Ans. 

    I expect a competitive salary based on my experience and the responsibilities of the role.

    • Research the average salary range for Senior Billing Engineers in your area

    • Consider your years of experience and any specialized skills you bring to the role

    • Factor in the responsibilities and expectations outlined in the job description

    • Be prepared to negotiate and discuss benefits and other compensation packages

  • Answered by AI
  • Q2. Share details of your previous job.
  • Ans. 

    I worked as a Senior Billing Engineer at XYZ Company.

    • Managed billing processes and systems for multiple clients

    • Developed and implemented billing strategies to optimize revenue

    • Collaborated with cross-functional teams to resolve billing issues

    • Analyzed billing data and generated reports for management

    • Implemented automation solutions to streamline billing operations

  • Answered by AI
  • Q3. Tell me about yourself.
  • Ans. 

    I am an experienced Senior Billing Engineer with a strong background in billing systems and processes.

    • Over 10 years of experience in billing engineering

    • Expertise in designing and implementing billing systems

    • Proficient in analyzing and optimizing billing processes

    • Strong knowledge of billing software and tools

    • Proven track record of improving billing accuracy and efficiency

    • Excellent problem-solving and communication skill

  • Answered by AI
  • Q4. Send me your last six month salary slip
  • Ans. 

    The candidate should politely decline to provide their salary slip.

    • Politely decline to provide the salary slip

    • Explain that sharing salary information is confidential and against company policy

    • Offer to provide other relevant documents or information to demonstrate qualifications

  • Answered by AI
  • Q5. Send me Company offer latter
Round 3 - Technical 

(6 Questions)

  • Q1. Rate analysis, reconciliation of steel & cement , Technical questions, present designation, about experience etc.
  • Q2. Your govt project experience
  • Ans. 

    I have worked on multiple government projects related to billing and invoicing.

    • Developed billing software for a government agency to automate their invoicing process

    • Managed billing and invoicing for a government healthcare program

    • Implemented cost tracking system for a government construction project

    • Collaborated with government officials to ensure compliance with regulations and policies

  • Answered by AI
  • Q3. Tell me About EPC pattern billing, item wise Billing etc.
  • Ans. 

    EPC pattern billing is a method of billing used in engineering, procurement, and construction projects. Item wise billing is a detailed billing method that lists each item separately.

    • EPC pattern billing is used in large-scale projects where the scope of work is extensive and complex.

    • It involves breaking down the project into various stages and billing for each stage separately.

    • Item wise billing is a detailed billing me...

  • Answered by AI
  • Q4. Did you MEP & Finishing Billing
  • Q5. Tell me about MEP items billing
  • Ans. 

    MEP items billing refers to the process of invoicing for mechanical, electrical, and plumbing items used in construction projects.

    • MEP items include HVAC systems, electrical wiring, plumbing fixtures, and more

    • Billing is based on the quantity and cost of materials used, as well as labor and overhead expenses

    • Accurate tracking of MEP items is essential for proper billing and project management

    • Software such as Bluebeam Revu...

  • Answered by AI
  • Q6. Tell me about finishing items billing
  • Ans. 

    Finishing items billing refers to the process of invoicing for the final stages of a project or service.

    • Includes billing for any remaining work or materials needed to complete the project

    • May involve calculating and billing for change orders or additional work

    • Requires close collaboration with project managers and clients to ensure accuracy

    • Examples include billing for final touches on a construction project or last-minut...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Psp Projects Senior Billing Engineer interview:
  • Civil Engineering
  • Billing
Interview preparation tips for other job seekers - Firstly thanks Nokari.Com for give me this opportunity.
Becouse, I found this offer by nokri.com
PSP projects limited is a best company.
Firstly interview time , keep your self in confidence.
My interview went well.
He asked me many questions
When ,I couldn't answer some questions than I said sorry.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 413 Interviews
Apco Infratech Interview Questions
3.7
 • 111 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
GMR Group Interview Questions
4.1
 • 77 Interviews
View all
13% less than the average Planning & Billing Engineer Salary in India
View more details

Brij Gopal Construction Company Planning & Billing Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Highway Engineer
23 salaries
unlock blur

₹2 L/yr - ₹6.2 L/yr

Senior Engineer
18 salaries
unlock blur

₹4.5 L/yr - ₹7.3 L/yr

Accountant
15 salaries
unlock blur

₹1.9 L/yr - ₹4.2 L/yr

Store Officer
15 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Executive Accountant
14 salaries
unlock blur

₹2.3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Brij Gopal Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview