Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
Seeking new challenges and opportunities for growth.
Looking for new challenges and opportunities to learn and grow
Interested in working on different projects or industries
Seeking a better work-life balance or company culture
Want to relocate to a different city or country for personal reasons
Top trending discussions
In 5 years, I see myself as a senior design engineer leading a team of designers and working on innovative projects.
Leading a team of designers
Working on innovative projects
Continuing to learn and develop my skills
Contributing to the growth and success of the company
Building strong relationships with clients and colleagues
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 31 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
posted on 24 Apr 2023
I applied via Monster and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 31 Jan 2023
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
The end-to-end process for wiring harness involves designing, manufacturing, testing, and installation.
Designing the wiring harness based on the electrical requirements and specifications
Manufacturing the harness using automated machines or manual labor
Testing the harness for electrical continuity, insulation resistance, and other parameters
Installing the harness in the vehicle or equipment
Ensuring proper routing and s...
FAI stands for First Article Inspection, a process to verify the initial production run meets all requirements.
FAI from 1 is the initial inspection of the first article produced in a production run
FAI from 2 is the inspection of the first article produced after changes have been made to the production process
FAI from 3 is the inspection of the first article produced after changes have been made to the design or enginee...
based on 1 interview
Interview experience
Senior Engineer
254
salaries
| ₹4.3 L/yr - ₹9.8 L/yr |
Engineer
169
salaries
| ₹2.6 L/yr - ₹6.5 L/yr |
Assistant Manager
161
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Production Engineer
146
salaries
| ₹2.5 L/yr - ₹7.6 L/yr |
Deputy Manager
96
salaries
| ₹9.2 L/yr - ₹17.5 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros