Upload Button Icon Add office photos

Filter interviews by

B. G. Shirke Construction Technology Assistant Engineer (QA/QC) Interview Questions and Answers

Updated 11 Mar 2021

B. G. Shirke Construction Technology Assistant Engineer (QA/QC) Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Tell about your self ? About QA/QC IS code related work and test methodology
  • Q2. Brief describe working exp. And , Material testing is code concrete mix design code and SCC concrete knowledge
  • Q3. Study details about precast concrete and GP2 , grouting material, SSC concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - confidence

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Assignment 

About any road ways and types of bridges and classification of is codes for building construction

Round 2 - Group Discussion 

About any road ways and classification of turnouts.

Interview Preparation Tips

Topics to prepare for AECOM Junior Engineer interview:
  • Salary
Interview preparation tips for other job seekers - Going to Job and there have safely. Be careful and keep safe.And be strong and be happy.

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Shuttering area,RMC pour card etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Work culture is very tough, so if u are joining then be ready

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions regarding our branch and field work
Round 3 - HR 

(1 Question)

  • Q1. Regarding experience and salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - This is just a formal advice to everyone those who are looking for PSP project limited joining their 2 round interview will be held one is our technical round and another one is hr round.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Building structure
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Estimation of a small building.

Round 3 - Technical 

(4 Questions)

  • Q1. Ratio of block work motor and plastrimg motor.
  • Ans. 

    The ratio of block work motor to plastering motor is typically 1:3.

    • The ratio of block work motor to plastering motor is usually 1:3.

    • This means for every 1 part of block work motor, 3 parts of plastering motor are used.

    • The ratio may vary depending on the specific project requirements.

  • Answered by AI
  • Q2. Per day productivity of a labour
  • Ans. 

    The productivity of a laborer can be calculated by the amount of work completed in a day.

    • Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.

    • Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.

    • Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.

  • Answered by AI
  • Q3. Amount of binding wire to be used per tone of reinforcement
  • Ans. 

    Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.

    • Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.

    • The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.

    • Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr

  • Answered by AI
  • Q4. Density of materials
  • Ans. 

    Density of materials is a measure of how much mass is contained in a given volume.

    • Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).

    • Materials with higher density have more mass packed into a given volume.

    • Common examples of materials with high density include metals like lead and gold.

    • Materials with low density include gases like helium and liquids like oil.

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free to talk to the interviewer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Bar Bending Schedule
  • Q2. Find out shuttering Area
  • Ans. 

    Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.

    • Calculate the surface area of each individual formwork used for the concrete structure

    • Add up the surface areas of all formworks to get the total shuttering area

    • Consider any openings or gaps in the formwork when calculating the area

  • Answered by AI
  • Q3. Semi circle area formula
  • Ans. 

    The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.

    • The formula for the area of a semi-circle is (1/2) * pi * r^2

    • The radius (r) is half the diameter of the circle

    • Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Why u want to join this company ?
  • Q2. Why u want to quit Your present company
  • Q3. About my Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. 1) different between diafraam wall and retaining wall
  • Ans. 

    Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.

    • Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.

    • Retaining walls are used to hold back soil and prevent it from sliding or eroding.

    • Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.

    • Retaining walls can be made of v...

  • Answered by AI
  • Q2. Which type of material used for shuttering
  • Ans. 

    Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.

    • Plywood is the most commonly used material for shuttering due to its durability and affordability.

    • Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.

    • Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.

    • Plastic is a cost-effective option for simple construction pro...

  • Answered by AI
  • Q3. Calculate the bbs of 4 by 3m footing, d = 300mm , dia of steel = 12mm
  • Ans. 

    Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.

    • Calculate the total length of steel required

    • Determine the spacing between the bars

    • Prepare a detailed bar bending schedule

  • Answered by AI
  • Q4. Hot to calculate the quantity of concrete for trapezoidal footing
  • Ans. 

    To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.

    • Measure the length, width, and height of the trapezoidal footing

    • Calculate the area of the trapezoidal base using the formula (a+b)/2 * h

    • Calculate the volume of the trapezoidal prism using the formula area of base * height

    • Multiply the volume by the number of trapezoidal footings needed

    • Add an additi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and tell about your experience then they ask questions from you work experience

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

B. G. Shirke Construction Technology Interview FAQs

What are the top questions asked in B. G. Shirke Construction Technology Assistant Engineer (QA/QC) interview?

Some of the top questions asked at the B. G. Shirke Construction Technology Assistant Engineer (QA/QC) interview -

  1. brief describe working exp. And , Material testing is code concrete mix design ...read more
  2. study details about precast concrete and GP2 , grouting material, SSC concre...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
42% more than the average Assistant Engineer (QA/QC) Salary in India
View more details
Junior Engineer Civil
317 salaries
unlock blur

₹1.2 L/yr - ₹5 L/yr

Junior Engineer
175 salaries
unlock blur

₹1.7 L/yr - ₹7.1 L/yr

Assistant Engineer
106 salaries
unlock blur

₹3.5 L/yr - ₹8.5 L/yr

Assistant Engineer - Civil
92 salaries
unlock blur

₹3 L/yr - ₹7.1 L/yr

Senior Engineer
81 salaries
unlock blur

₹4.5 L/yr - ₹10 L/yr

Explore more salaries
Compare B. G. Shirke Construction Technology with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sam Higginbottom Institute of Agriculture, Technology and Sciences

4.1
Compare

Apco Infratech

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview