Filter interviews by
I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I applied via Recruitment Consultant and was interviewed in May 2017. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
About experience about cell and SOP,MSDS, etc.
About experience about and how to improve quality, efficiency,
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Assistant Manager
114
salaries
| ₹6.5 L/yr - ₹19.6 L/yr |
Senior Engineer
63
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Senior Executive
46
salaries
| ₹5 L/yr - ₹10.3 L/yr |
Engineer
44
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Electrical Engineer
35
salaries
| ₹2.9 L/yr - ₹8.5 L/yr |
ReNew
Vestas
Sterlite Power
Emmvee Photovoltaic Power