Filter interviews by
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
based on 19 reviews
Rating in categories
Assistant Manager
114
salaries
| ₹6.5 L/yr - ₹19.6 L/yr |
Senior Engineer
63
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Senior Executive
46
salaries
| ₹5 L/yr - ₹10.3 L/yr |
Engineer
37
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Electrical Engineer
35
salaries
| ₹2.9 L/yr - ₹8.5 L/yr |
ReNew
Vestas
Sterlite Power
Emmvee Photovoltaic Power