Filter interviews by
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Anchorage length is the length of reinforcement required to transfer the load from the structure to the anchor or support.
Anchorage length is determined by the type of reinforcement and the design load.
It is important to ensure that the anchorage length is sufficient to prevent failure.
Examples of anchorage length include the length of rebar embedded in concrete or the length of tendons in post-tensioned structures.
The slump test is a measure of the consistency and workability of fresh concrete.
It is used to determine the water content in the concrete mixture.
A slump cone is filled with freshly mixed concrete and then lifted vertically.
The amount of slump or settlement of the concrete is measured in millimeters.
The test helps in assessing the quality and uniformity of the concrete mix.
Different slump values are required for diffe
There are various types of slabs used in construction projects.
One-way slab: Supported by beams on two opposite sides.
Two-way slab: Supported by beams on all four sides.
Flat slab: No beams, directly supported by columns.
Ribbed slab: Consists of a series of parallel ribs.
Waffle slab: Consists of a grid of ribs and beams forming square or rectangular patterns.
Top trending discussions
posted on 7 Feb 2022
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 1 Nov 2023
I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.
I have a total of 18 years of experience in power plant and oil and gas plant.
Experience includes working on various projects in power plant and oil and gas plant
Knowledge of electrical systems, equipment, and regulations in these industries
Hands-on experience in maintenance, troubleshooting, and project management
Strong understanding of safety protocols and procedures in high-risk environments
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 28 Jul 2023
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 4 interview rounds.
The maximum size of coarse aggregate is typically limited to 40 mm.
The maximum size of coarse aggregate is usually specified in the project specifications.
In general, the maximum size of coarse aggregate is limited to 1.5 times the minimum clear spacing between the reinforcement bars.
For most construction projects, the maximum size of coarse aggregate is 40 mm.
Using larger size aggregates can lead to segregation and di
posted on 4 May 2024
posted on 11 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
based on 1 review
Rating in categories
Senior Engineer
6
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Civil Foreman
4
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Assistant Accounts Manager
4
salaries
| ₹7.2 L/yr - ₹8.5 L/yr |
Engineer
3
salaries
| ₹3.2 L/yr - ₹7.8 L/yr |
Deputy Engineer
3
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
ABCI Infrastructures
Nesma & Partners
VIKRAN Engineering & Exim
The Louis Berger Group