Round 1 - Technical 

(1 Question)

  • Q1. Project related
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Discussed with past experience
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my last experience
Round 3 - Group Discussion 

About discussed the previous work experience and family background.

Electrical Site Engineer Interview Questions Asked at Other Companies

Q1. What is the maximum range of voltage rating for belted cables are ... read more
Q2. What can protect a cable against mechanical enjury?
Q3. How much torque a synchronous motor can develop?
Q4. What is tranformer? Transformer is a statics device and x-mer wor ... read more
Q5. what is relay and how to work for relay and type of relay.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Find your information
  • Q2. Site Work related questions
Round 3 - Others 

(1 Question)

  • Q1. Project Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fyi
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why you should left your previous company?
Round 3 - Technical 

(1 Question)

  • Q1. The maximum size of coarse aggregate?
  • Ans. 

    The maximum size of coarse aggregate is typically limited to 40 mm.

    • The maximum size of coarse aggregate is usually specified in the project specifications.

    • In general, the maximum size of coarse aggregate is limited to 1.5 times the minimum clear spacing between the reinforcement bars.

    • For most construction projects, the maximum size of coarse aggregate is 40 mm.

    • Using larger size aggregates can lead to segregation and di

  • Answered by AI
Round 4 - One-on-one 

(1 Question)

  • Q1. Why we have select you on this position?
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Find your information
  • Q2. Site Work related questions
Round 3 - Others 

(1 Question)

  • Q1. Project Related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fyi

Leena Powertech Engineers Interview FAQs

How many rounds are there in Leena Powertech Engineers Electrical Site Engineer interview?
Leena Powertech Engineers interview process usually has 2 rounds. The most common rounds in the Leena Powertech Engineers interview process are Technical, HR and Group Discussion.

Tell us how to improve this page.

Leena Powertech Engineers Electrical Site Engineer Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
Thermax Limited Interview Questions
4.2
 • 245 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
Havells Interview Questions
4.0
 • 207 Interviews
Tata Power Interview Questions
3.9
 • 161 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all
Leena Powertech Engineers Electrical Site Engineer Salary
based on 24 salaries
₹2.8 L/yr - ₹7.2 L/yr
38% more than the average Electrical Site Engineer Salary in India
View more details

Leena Powertech Engineers Electrical Site Engineer Reviews and Ratings

based on 9 reviews

3.4/5

Rating in categories

3.5

Skill development

4.2

Work-life balance

3.4

Salary

3.5

Job security

4.2

Company culture

3.5

Promotions

3.5

Work satisfaction

Explore 9 Reviews and Ratings
Electrical Site Engineer
24 salaries
unlock blur

₹2.8 L/yr - ₹7.2 L/yr

Site Engineer
22 salaries
unlock blur

₹3.4 L/yr - ₹6.5 L/yr

Store Incharge
18 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹4.2 L/yr - ₹6 L/yr

Project Coordinator
7 salaries
unlock blur

₹2 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Leena Powertech Engineers with

BGR Energy Systems

3.7
Compare

Thermax Limited

4.2
Compare

Kirloskar Electric Company

3.5
Compare

Siemens

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview