Upload Button Icon Add office photos

Filter interviews by

Leena Powertech Engineers Divisional Incharge Interview Questions and Answers

Updated 16 Jul 2024

Leena Powertech Engineers Divisional Incharge Interview Experiences

1 interview found

Divisional Incharge Interview Questions & Answers

user image ANKUR KULSHRESTHA

posted on 16 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Experience about present and previous company
Round 2 - Technical 

(1 Question)

  • Q1. Present work process
  • Ans. 

    Our current work process involves analyzing market trends, setting targets, delegating tasks, monitoring progress, and ensuring timely completion.

    • Analyze market trends to identify opportunities and threats

    • Set targets based on market analysis and company goals

    • Delegate tasks to team members based on their strengths and expertise

    • Monitor progress regularly to ensure tasks are on track

    • Ensure timely completion of tasks to me

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Final Negotiation

Interview questions from similar companies

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical about railway experience in OHE
  • Q2. Commerical experience related to client billing
  • Ans. 

    I have extensive commercial experience related to client billing.

    • Managed client billing for a software company, ensuring timely and accurate invoicing

    • Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue

    • Collaborated with sales team to resolve billing discrepancies and improve client satisfaction

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small organisation but growing in a steady path
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Round 3 - HR 

(1 Question)

  • Q1. Why are you joining this organization

Interview Preparation Tips

Interview preparation tips for other job seekers - Be transparent

I applied via Referral

Interview Questionnaire 

2 Questions

  • Q1. I was asked about power Converters.
  • Q2. I was asked about Traction Transformers

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be true. Never give bluff.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions
Round 3 - Technical 

(1 Question)

  • Q1. Basics of strength of material
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is experience
Round 2 - Technical 

(1 Question)

  • Q1. Where did you worked
Round 3 - HR 

(1 Question)

  • Q1. What are your expectations

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

Leena Powertech Engineers Interview FAQs

How many rounds are there in Leena Powertech Engineers Divisional Incharge interview?
Leena Powertech Engineers interview process usually has 3 rounds. The most common rounds in the Leena Powertech Engineers interview process are HR and Technical.
What are the top questions asked in Leena Powertech Engineers Divisional Incharge interview?

Some of the top questions asked at the Leena Powertech Engineers Divisional Incharge interview -

  1. Present work proc...read more
  2. Final Negotiat...read more

Tell us how to improve this page.

Leena Powertech Engineers Divisional Incharge Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Leena Powertech Engineers Divisional Incharge Salary
based on 5 salaries
₹5.5 L/yr - ₹7.5 L/yr
35% more than the average Divisional Incharge Salary in India
View more details
Electrical Site Engineer
23 salaries
unlock blur

₹2.8 L/yr - ₹7.2 L/yr

Site Engineer
22 salaries
unlock blur

₹3.4 L/yr - ₹6.5 L/yr

Store Incharge
18 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Civil Site Engineer
9 salaries
unlock blur

₹4.2 L/yr - ₹6 L/yr

Project Coordinator
7 salaries
unlock blur

₹2 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Leena Powertech Engineers with

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare

Nesma & Partners

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview