Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2019. There were 2 interview rounds.
Top trending discussions
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 2 May 2021
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
I am satisfied with management's view on cost cutting as they have implemented effective strategies to reduce expenses without compromising quality.
Management has successfully implemented cost cutting measures without affecting the quality of products or services
They have involved employees in the cost cutting process to gather valuable insights and suggestions
Management regularly reviews and adjusts cost cutting strat...
Electrical Site Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Incharge
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Coordinator
7
salaries
| ₹0 L/yr - ₹0 L/yr |
BGR Energy Systems
Thermax Limited
Kirloskar Electric Company
Siemens