I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Anchorage length is the length of reinforcement required to transfer the load from the structure to the anchor or support.
Anchorage length is determined by the type of reinforcement and the design load.
It is important to ensure that the anchorage length is sufficient to prevent failure.
Examples of anchorage length include the length of rebar embedded in concrete or the length of tendons in post-tensioned structures.
The slump test is a measure of the consistency and workability of fresh concrete.
It is used to determine the water content in the concrete mixture.
A slump cone is filled with freshly mixed concrete and then lifted vertically.
The amount of slump or settlement of the concrete is measured in millimeters.
The test helps in assessing the quality and uniformity of the concrete mix.
Different slump values are required for diffe
There are various types of slabs used in construction projects.
One-way slab: Supported by beams on two opposite sides.
Two-way slab: Supported by beams on all four sides.
Flat slab: No beams, directly supported by columns.
Ribbed slab: Consists of a series of parallel ribs.
Waffle slab: Consists of a grid of ribs and beams forming square or rectangular patterns.
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Logic test and personality test
I am a sustainability consultant with a background in environmental science and experience in implementing sustainable practices.
Background in environmental science
Experience in implementing sustainable practices
Passionate about promoting sustainability in various industries
Passionate about promoting sustainable practices and making a positive impact on the environment.
Passionate about environmental conservation and sustainability
Believe in the importance of implementing sustainable practices in businesses
Excited about the opportunity to help organizations reduce their carbon footprint
Previous experience in sustainability projects or initiatives
I faced a challenge in my previous role when implementing a sustainability program for a large corporation.
Resistance from upper management to allocate resources for sustainability initiatives
Difficulty in engaging employees at all levels to participate in sustainability efforts
Lack of buy-in from stakeholders outside of the organization
Balancing short-term financial goals with long-term sustainability objectives
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
posted on 13 Feb 2025
I was interviewed in Jan 2025.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
based on 2 interviews
Interview experience
based on 24 reviews
Rating in categories
Senior Engineer
6
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Civil Foreman
4
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Assistant Accounts Manager
4
salaries
| ₹7.2 L/yr - ₹8.5 L/yr |
Engineer
3
salaries
| ₹3.2 L/yr - ₹7.8 L/yr |
Deputy Engineer
3
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
ABCI Infrastructures
VIKRAN Engineering & Exim
Nesma & Partners
The Louis Berger Group