i
Auro Realty Private Limited
Filter interviews by
I applied via Approached by Company and was interviewed before Mar 2021. There were 2 interview rounds.
Depillaring with split & finder method, working with continuous miner & monitoring instruments for extraction of coal. Production management and their related issues(inventory)
Depillaring work experience with continuous miner project using fish & bone, nevid method, strata monitoring instruments, and safety precautions.
I have worked on depillaring projects using continuous miner and fish & bone method.
I am familiar with the nevid method and have used it in my work experience.
I have experience using strata monitoring instruments to ensure safety during depillaring.
I always follow safety preca...
Top trending discussions
I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.
Duration was 1 hour and test was related to check excel proficiency
posted on 11 Jun 2024
I applied via Approached by Company and was interviewed before Jun 2023. There were 3 interview rounds.
posted on 7 May 2023
I applied via Naukri.com and was interviewed before May 2022. There were 3 interview rounds.
posted on 24 Feb 2021
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
Answering questions related to construction projects and past experience.
Cost per square foot is dependent on various factors such as location, materials used, and labor costs.
Steel consumption per square foot varies depending on the type of structure and design.
Concrete consumption per square foot also varies depending on the type of structure and design.
All activities required to complete a building per square foot i...
The interviewee was asked about method of statement, SOP followed in past, and quality process followed.
For each activity, a detailed method of statement is prepared to ensure proper execution.
Standard Operating Procedures (SOPs) are followed to maintain consistency and efficiency.
A quality process is followed to ensure that the work meets the required standards and specifications.
Examples of quality processes include ...
I applied via Job Portal and was interviewed before Nov 2020. There was 1 interview round.
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
Managed technical operations for a team of engineers, overseeing project timelines and deliverables.
Led a team of engineers in executing technical projects
Monitored project timelines and ensured deliverables were met
Collaborated with cross-functional teams to address technical challenges
Implemented process improvements to enhance efficiency
based on 1 review
Rating in categories
Assistant Manager
73
salaries
| ₹5.5 L/yr - ₹14 L/yr |
Deputy Manager
46
salaries
| ₹7 L/yr - ₹17.4 L/yr |
Engineer
43
salaries
| ₹3.9 L/yr - ₹8.8 L/yr |
Senior Engineer
40
salaries
| ₹5.3 L/yr - ₹9.3 L/yr |
Manager
20
salaries
| ₹7.5 L/yr - ₹18.1 L/yr |
DLF
Prestige Group
Godrej Properties
Sobha