Filter interviews by
I conducted 15 field visits. The most critical issue was a faulty component causing system failure.
Conducted 15 field visits to various locations
Encountered a critical issue with a faulty component leading to system failure
Collaborated with on-site teams to diagnose and address the issue
Implemented corrective actions to prevent future failures
I identified the root cause by conducting thorough analysis using tools such as fishbone diagram, 5 Whys, and failure mode and effects analysis (FMEA).
Conducted a detailed investigation into the issue to gather relevant data and information
Utilized tools such as fishbone diagram to visually map out potential causes of the problem
Implemented the 5 Whys technique to repeatedly ask 'why' until the root cause was uncovered
...
Proficient in Excel for data analysis, modeling, and visualization.
Proficient in using formulas, pivot tables, and charts for data analysis
Experience in creating complex spreadsheets for failure analysis reports
Utilize Excel for statistical analysis and trend identification
Comfortable with VLOOKUP, IF statements, and data validation in Excel
Whisker charts in Excel show variability and distribution of data points in a dataset.
Whisker charts are also known as box and whisker plots.
They display the minimum, maximum, median, and quartiles of a dataset.
Whisker charts are useful for identifying outliers and understanding the spread of data.
They are commonly used in statistical analysis and quality control.
Example: Creating a whisker chart in Excel to analyze th
Quality tools on Excel help analyze data for identifying and solving quality issues.
Use Pareto charts to identify the most significant quality issues
Utilize control charts to monitor process stability and identify trends
Perform root cause analysis using fishbone diagrams
Use scatter plots to identify correlations between variables
Utilize histograms to visualize distribution of data
If Cp is 0.8, the process is not capable of meeting the specified requirements consistently.
Process may produce a high number of defects or errors.
Variability in the process output may be too high.
Quality control measures may need to be improved.
Example: If Cp is 0.8 for a manufacturing process, it means the process is not capable of producing parts within the specified tolerances consistently.
The percentage rejection in process for Cp of 1.3 is calculated based on the Cp value and process specifications.
Calculate the Cp index using the formula Cp = (USL - LSL) / (6 * standard deviation)
Determine the process capability based on the Cp value (Cp < 1 indicates poor capability, Cp = 1 indicates minimum acceptable capability, Cp > 1 indicates good capability)
Calculate the percentage rejection using the for
I am passionate about failure analysis and believe this company offers a great opportunity for growth and development in the field.
Opportunity to work with cutting-edge technology
Desire to contribute to a team of experts in failure analysis
Company's reputation for innovation and excellence
Alignment with personal career goals
I may not have direct experience in field quality, but I possess strong analytical skills, attention to detail, and a quick learning ability.
I have a solid foundation in engineering principles and problem-solving techniques from my education and previous work experiences.
I am a quick learner and have a proven track record of adapting to new environments and learning new skills efficiently.
I am detail-oriented and have ...
Top trending discussions
I applied via Approached by Company and was interviewed in Apr 2023. There were 3 interview rounds.
My 5 year plan includes gaining expertise in new technologies, taking on leadership roles, and contributing to the growth of the company.
Continue learning and staying updated on latest technologies
Seek opportunities for leadership roles and mentorship
Contribute to company's growth through innovative projects and solutions
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
Seeking new challenges and opportunities for growth in a different environment.
Looking for new challenges and opportunities for growth
Interested in exploring different technologies and industries
Seeking a better work-life balance
Want to work in a more collaborative team environment
As a Sr. engineer in my current company, my roles and responsibilities include leading a team of engineers, designing and implementing complex systems, and ensuring project deadlines are met.
Leading a team of engineers
Designing and implementing complex systems
Ensuring project deadlines are met
I was interviewed before Feb 2024.
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2020. There was 1 interview round.
MCB components are typically made of materials such as copper, silver, thermoplastics, and ceramics.
Copper is commonly used for conducting electricity in MCBs.
Silver is sometimes used as a contact material for better conductivity.
Thermoplastics like polyamide are used for insulation and housing of MCB components.
Ceramics are used for arc chutes to extinguish the arc when the MCB trips.
Other materials like steel, brass,...
SOC refers to the state of charge of a battery, SOH refers to the state of health, pre-charge is the initial charging process, and cell chemistry refers to the type of chemicals used in the battery.
SOC is the amount of charge remaining in a battery, expressed as a percentage of its maximum capacity.
SOH is a measure of a battery's overall health and its ability to hold a charge over time.
Pre-charge is the initial chargi...
posted on 11 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
Some of the top questions asked at the Atomberg Technologies Failure Analysis Engineer interview -
based on 1 interview
Interview experience
Area Sales Executive
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Management Trainee
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Ather Energy
SYSKA LED Lights
Livpure
Havells