Asia Chennai Engineering Company Quantity Surveyor Interview Questions and Answers

Updated 19 Feb 2025

Asia Chennai Engineering Company Quantity Surveyor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(1 Question)

  • Q1. Experience details

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Is code for mode of measurement, Types of joints in flooring, What type of projects previously done and how estimation prepared
  • Ans. 

    The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.

    • The code for mode of measurement refers to the standard method used to measure quantities in construction projects.

    • Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.

    • Previous projects can include residential buildings, commercial complexes, ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Billing,rate analysis & estimate

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident,when you face the interview.

Interview Questionnaire 

1 Question

  • Q1. EPC contracts schedules, Bill making experience

I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is cost to complete
  • Ans. 

    Cost to complete refers to the estimated amount of money required to finish a project or task.

    • Cost to complete is an important metric used in project management and quantity surveying.

    • It takes into account the remaining work, resources, and expenses needed to complete a project.

    • It helps in assessing the financial status of a project and making informed decisions.

    • Cost to complete can be calculated by subtracting the act...

  • Answered by AI
  • Q2. Unit weight of various steel bars
  • Ans. 

    Unit weight of steel bars varies based on their diameter and length.

    • The weight of steel bars is measured in kilograms per meter (kg/m).

    • The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.

    • For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge and basic strong and be confident

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All questions about my previous job experience & present knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - just share your knowledge what you learn from your previous experience. if it is coincide with their requirement, U r the one what they expect from....
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Is code for mode of measurement, Types of joints in flooring, What type of projects previously done and how estimation prepared
  • Ans. 

    The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.

    • The code for mode of measurement refers to the standard method used to measure quantities in construction projects.

    • Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.

    • Previous projects can include residential buildings, commercial complexes, ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.

Asia Chennai Engineering Company Interview FAQs

How many rounds are there in Asia Chennai Engineering Company Quantity Surveyor interview?
Asia Chennai Engineering Company interview process usually has 1 rounds. The most common rounds in the Asia Chennai Engineering Company interview process are HR.

Tell us how to improve this page.

Asia Chennai Engineering Company Quantity Surveyor Salary
based on 8 salaries
₹2 L/yr - ₹6 L/yr
31% less than the average Quantity Surveyor Salary in India
View more details
Junior Engineer
20 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Senior Engineer
12 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹1.9 L/yr - ₹4.8 L/yr

Assistant Engineer
10 salaries
unlock blur

₹3.8 L/yr - ₹5.4 L/yr

Site Engineer
8 salaries
unlock blur

₹1.4 L/yr - ₹3.1 L/yr

Explore more salaries
Compare Asia Chennai Engineering Company with

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare

HCLTech

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview