Upload Button Icon Add office photos

Filter interviews by

Asia Chennai Engineering Company Interview Questions and Answers

Updated 19 Feb 2025

Asia Chennai Engineering Company Interview Experiences

Popular Designations

3 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Bbs calculation at office
  • Ans. 

    BBS calculation involves determining the quantity of steel reinforcement required for a structure.

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes.

    • Calculations are based on structural drawings and design requirements.

    • Factors such as bar diameter, spacing, lap lengths, and development lengths are considered in the calculation.

    • Software programs like AutoCAD...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Aap koo is company ne jana chiye but ye company kabhi bhi aap koo experience letter or reliving letter ne degi aap
Job Time bahot strick hota he 9 bahe se jana he
But ghar aane ka Time fix ne hota

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(1 Question)

  • Q1. Experience details

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

I applied via Walk-in and was interviewed in Dec 2021. There was 0 interview round.

Interview Preparation Tips

Topics to prepare for Asia Chennai Engineering Company Senior Store Incharge interview:
  • Networking
Interview preparation tips for other job seekers - Hard work good work improve my skills

Senior Store Incharge Interview Questions asked at other Companies

Q1. How to reduce westage. what is meaning of stock take
View answer (1)

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I appeared for an interview in Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. They asked me about RAM and ROM

Interview Preparation Tips

Round: Technical Interview
Experience: I studied about them before so it was not a problem for me

Skills: Coding Skills
College Name: IIT Kharagpur

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

Interview Questionnaire 

1 Question

  • Q1. Business Ideas

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare properly for Interviews
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect

Asia Chennai Engineering Company Interview FAQs

How many rounds are there in Asia Chennai Engineering Company interview?
Asia Chennai Engineering Company interview process usually has 1 rounds. The most common rounds in the Asia Chennai Engineering Company interview process are Technical and HR.
How to prepare for Asia Chennai Engineering Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Asia Chennai Engineering Company. The most common topics and skills that interviewers at Asia Chennai Engineering Company expect are Civil, Quality, labour, Cables and Power House.

Tell us how to improve this page.

Asia Chennai Engineering Company Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

Asia Chennai Engineering Company Reviews and Ratings

based on 62 reviews

4.1/5

Rating in categories

4.2

Skill development

3.8

Work-life balance

3.6

Salary

4.2

Job security

3.7

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 62 Reviews and Ratings
Junior Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Senior Engineer
12 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹1.9 L/yr - ₹4.8 L/yr

Assistant Engineer
10 salaries
unlock blur

₹3.8 L/yr - ₹5.4 L/yr

Site Engineer
8 salaries
unlock blur

₹1.4 L/yr - ₹3.1 L/yr

Explore more salaries
Compare Asia Chennai Engineering Company with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview