Upload Button Icon Add office photos

Ashoka Buildcon

Compare button icon Compare button icon Compare

Filter interviews by

Ashoka Buildcon Site Engineer Interview Questions and Answers for Experienced

Updated 3 Oct 2024

Ashoka Buildcon Site Engineer Interview Experiences for Experienced

1 interview found

Site Engineer Interview Questions & Answers

user image ahmad equbal

posted on 3 Oct 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is the density of RCC structure
  • Ans. 

    The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.

    • Density of RCC is influenced by the type and proportion of materials used.

    • Common density range for RCC is 2200 to 2500 kg/m^3.

    • Higher density indicates stronger and more durable RCC structure.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Tell me about ur self in brief
  • Q2. Qualifications and working experience related questions
  • Q3. Problem solving questions
  • Q4. Conditional questions
  • Q5. About concrete grade

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Site Engineer interview:
  • Works relate
  • Execution
  • Concrete
  • Bbs
  • Billing
Interview preparation tips for other job seekers - If u r experienced person then gain deep knowledge related to ur field and which are your previous working experience u have.

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Interview Questionnaire 

1 Question

  • Q1. How many techniques you often use to do your work?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated time on work will helps you to gain pure knowledge, which is remember for life time and helps to gain confidence to do that work perfectly. This confidence reflect by your voice and face, which is recognised by interviewer.

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 32 dia 1 meter weight how much?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions and previous company project details must

I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Steel and SHUTTERING, project management
  • Q2. Hook lenght, deduction of steel in bends

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive always , face with your knowledge and attitude

Ashoka Buildcon Interview FAQs

How many rounds are there in Ashoka Buildcon Site Engineer interview for experienced candidates?
Ashoka Buildcon interview process for experienced candidates usually has 1 rounds. The most common rounds in the Ashoka Buildcon interview process for experienced candidates are Technical.
What are the top questions asked in Ashoka Buildcon Site Engineer interview for experienced candidates?

Some of the top questions asked at the Ashoka Buildcon Site Engineer interview for experienced candidates -

  1. Size of concrete c...read more
  2. 150mm*150mm*15...read more

Tell us how to improve this page.

Ashoka Buildcon Site Engineer Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more
Ashoka Buildcon Site Engineer Salary
based on 76 salaries
₹1.8 L/yr - ₹5.5 L/yr
At par with the average Site Engineer Salary in India
View more details

Ashoka Buildcon Site Engineer Reviews and Ratings

based on 30 reviews

4.1/5

Rating in categories

4.1

Skill development

3.5

Work-life balance

3.6

Salary

3.7

Job security

3.8

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 30 Reviews and Ratings
Engineer
198 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
147 salaries
unlock blur

₹3.5 L/yr - ₹10 L/yr

Store Keeper
78 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Site Engineer
76 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Civil Engineer
72 salaries
unlock blur

₹2.1 L/yr - ₹6 L/yr

Explore more salaries
Compare Ashoka Buildcon with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview