Filter interviews by
I applied via Approached by Company
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
IS codes for civil and working experience
IS codes refer to the Indian Standards codes for civil engineering
These codes provide guidelines and specifications for various aspects of civil engineering
Some important IS codes for civil engineering include IS 456:2000 for the design of concrete structures, IS 800:2007 for the design of steel structures, and IS 1893:2016 for seismic design
Working experience in civil engineeri...
Top trending discussions
I applied via Walk-in and was interviewed in Jun 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Dec 2021. There was 1 interview round.
I applied via Walk-in
About your job, location, CTC
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 27 Nov 2023
The process of a Water Treatment Plant (WTP) involves several stages to purify water for safe consumption.
Coagulation and Flocculation: Chemicals are added to water to remove suspended particles.
Sedimentation: The water is allowed to settle, and the solids are removed.
Filtration: Water passes through various filters to remove smaller particles.
Disinfection: Chlorine or other disinfectants are added to kill harmful micr...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo
I am available to join immediately.
I can start working as soon as possible.
I am flexible with the joining date.
I am ready to begin work immediately.
I can join within a week of receiving the offer.
I am excited to start working on the specified joining date.
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer about my intention to leave and they are aware of my notice period.
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Our plant follows strict safety protocols, efficient workflow procedures, and regular maintenance schedules.
We have daily safety meetings to discuss potential hazards and ensure compliance with safety regulations.
Our workflow procedures are designed to maximize efficiency and productivity, with regular reviews to identify areas for improvement.
We have a comprehensive maintenance schedule in place to prevent breakdowns ...
posted on 20 Jul 2024
The size of steel used for columns depends on the load it needs to support and the height of the column.
The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.
The size of steel columns can also be determined based on the structural design calculations and building codes.
Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...
Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.
Development bars length is determined based on structural design requirements.
It is important to follow the specifications provided by the structural engineer.
The length of development bars can vary depending on the type of structure and load requirements.
Proper placement and anchoring of developmen
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Production Engineer
18
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Deputy Manager
13
salaries
| ₹6.8 L/yr - ₹13.8 L/yr |
QA QC Engineer
11
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Senior Engineer
9
salaries
| ₹6.3 L/yr - ₹8.4 L/yr |
Safety Supervisor
9
salaries
| ₹2.9 L/yr - ₹3.5 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Consolidated Construction Consortium
SPML Infra