Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
Top trending discussions
I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.
Conduct a gap analysis to identify areas of improvement
Create a plan to implement ISO systems
Provide training to site engineers on ISO standards and quality improvements
Establish a system for monitoring and measuring quality performance
Encourage continuous improvement through regular audits and reviews
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on set rules to prevent unauthorized access
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and pfSense
Setting up an AD involves creating a new Active Directory domain and configuring settings.
Install the Active Directory Domain Services role on a Windows Server
Run the Active Directory Domain Services Configuration Wizard to create a new domain
Configure DNS settings to support the new domain
Add users, groups, and computers to the domain
Set up Group Policies to manage security and settings within the domain
What is your expectation of salary
The minimum time for concrete to gain strength is typically 28 days.
Concrete typically gains strength over time, with significant strength achieved after 28 days.
Factors such as mix design, curing conditions, and environmental factors can affect the rate of strength gain.
Testing is often done at various intervals to monitor the strength development of concrete.
Early strength concrete mixes are available for projects re
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
posted on 8 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
Production Engineer
18
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Deputy Manager
13
salaries
| ₹6.8 L/yr - ₹13.8 L/yr |
QA QC Engineer
11
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Senior Engineer
9
salaries
| ₹6.3 L/yr - ₹8.4 L/yr |
Safety Supervisor
9
salaries
| ₹2.9 L/yr - ₹3.5 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Consolidated Construction Consortium
SPML Infra