Upload Button Icon Add office photos

Filter interviews by

ARSS Infrastructure Projects Site Engineer Interview Questions and Answers for Experienced

Updated 23 Apr 2022

ARSS Infrastructure Projects Site Engineer Interview Experiences for Experienced

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Apr 2022

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. How much year experience
  • Ans. 

    I have 5 years of experience as a Site Engineer.

    • I have worked on various construction projects, overseeing the site operations and ensuring adherence to plans and specifications.

    • During my tenure, I have successfully managed teams, coordinated with subcontractors, and resolved on-site issues.

    • I am well-versed in interpreting blueprints, conducting quality inspections, and ensuring compliance with safety regulations.

    • One n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skills very confident and good knowledge

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Site related

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Steel and SHUTTERING, project management
  • Q2. Hook lenght, deduction of steel in bends

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive always , face with your knowledge and attitude
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Abouts my qualifications Why are you interested
Round 3 - Technical 

(1 Question)

  • Q1. My work related about water supply project

Interview Preparation Tips

Interview preparation tips for other job seekers - Increase your knowledge about your fields to the part of your area

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test Curing of method
  • Ans. 

    Slump test is a measure of the consistency of fresh concrete.

    • It is used to determine the workability of concrete.

    • The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.

    • The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.

    • Curing is the process of maintaining moisture in the concrete ...

  • Answered by AI
  • Q2. Cube test Direct Sher Test Plete lod test CBRTest

Interview Preparation Tips

Interview preparation tips for other job seekers - Manjil aur taqdeer khud hi bnani padti hai
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking about my work and previous work please and company including salary and benifits
Round 3 - Technical 

(2 Questions)

  • Q1. Asking about building structure work related questions and about my planing for smooth working on site,with coordination between contractor and company pmc or cleint
  • Q2. About quality quantity and site work

Interview Preparation Tips

Interview preparation tips for other job seekers - All prepared about your relevant sector interview with honesty

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 32 dia 1 meter weight how much?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions and previous company project details must

ARSS Infrastructure Projects Interview FAQs

How many rounds are there in ARSS Infrastructure Projects Site Engineer interview for experienced candidates?
ARSS Infrastructure Projects interview process for experienced candidates usually has 1 rounds. The most common rounds in the ARSS Infrastructure Projects interview process for experienced candidates are Technical.

Tell us how to improve this page.

ARSS Infrastructure Projects Site Engineer Salary
based on 11 salaries
₹1.8 L/yr - ₹3.9 L/yr
29% less than the average Site Engineer Salary in India
View more details

ARSS Infrastructure Projects Site Engineer Reviews and Ratings

based on 4 reviews

4.8/5

Rating in categories

5.0

Skill development

4.6

Work-life balance

4.6

Salary

4.4

Job security

4.8

Company culture

4.4

Promotions

4.6

Work satisfaction

Explore 4 Reviews and Ratings
Civil Site Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Site Engineer
11 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Store Incharge
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview