I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Regarding my past work experience.
  • Q2. Regarding well foundation & pile foundations.
  • Q3. Regarding other RCC structural activities.

Interview Preparation Tips

Interview preparation tips for other job seekers - What they asked, I replied accordingly. The interview experience was good.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Reagarding work experiences & background.
Round 2 - Technical 

(4 Questions)

  • Q1. Related to technical aspects of projects executed.
  • Q2. Concrete mix designs
  • Q3. P&M productivity - Earth works
  • Q4. Customer relationship related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers. See the scope and technical aspects of the experience claimed.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Stairs case ralling Section and fixing process
  • Q2. Productivity of plaster work and tiles
  • Ans. 

    The productivity of plaster work and tiles is an important factor in construction projects.

    • Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.

    • Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.

    • For example, experienced plasterers may be able to apply plaster m...

  • Answered by AI
  • Q3. Centiler beam steel design
  • Ans. 

    Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.

    • Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.

    • The section modulus is then used to select the appropriate beam size from standard steel beam tables.

    • Factors such as the type of load, material properties, and safety factors a...

  • Answered by AI
  • Q4. In footing 25 mm dia bend deduction yes ya No
  • Q5. Responsibility and team' work
  • Q6. Your work at site?
  • Q7. Work permit at site
  • Q8. Density of steel with unit
  • Ans. 

    The density of steel is a measure of its mass per unit volume.

    • Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.

    • The density of steel is an impo...

  • Answered by AI
  • Q9. AAC block price and size details
  • Ans. 

    AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.

    • AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.

    • The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.

    • The prices of AAC blocks depend on factors such as the brand, quality, and qu...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Manager interview:
  • Nice
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Explain about construction activities
  • Ans. 

    Construction activities encompass planning, designing, and building structures, ensuring safety and compliance with regulations.

    • Site Preparation: Clearing and leveling land before construction begins.

    • Foundation Work: Pouring concrete and laying the groundwork for stability.

    • Framing: Constructing the skeleton of the building using wood or steel.

    • Roofing: Installing the roof structure to protect the building from elements.

    • ...

  • Answered by AI
  • Q2. Explain procedure of Mivan Shuttering
  • Ans. 

    Mivan shuttering is an aluminum formwork system used for rapid construction of concrete structures.

    • 1. Preparation: Site is cleared and foundation is laid before shuttering installation.

    • 2. Assembly: Aluminum panels are assembled on-site to create the desired shape of walls and slabs.

    • 3. Alignment: Panels are aligned and secured to ensure accuracy in dimensions.

    • 4. Concrete Pouring: Concrete is poured into the formwork, fi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Lattice tower Sub bracing design
  • Ans. 

    Lattice tower sub bracing design involves the structural support system for the tower.

    • Sub bracing design is crucial for maintaining the stability and strength of lattice towers.

    • The design should consider factors such as wind load, weight distribution, and material strength.

    • Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.

    • Computer-aided design software is often used...

  • Answered by AI

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Your previous experience
  • Q2. Describe about yourself
  • Q3. Asked about my management skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be confident on, what you have done in your previous job.

ARSS Infrastructure Projects Interview FAQs

How to prepare for ARSS Infrastructure Projects Project Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ARSS Infrastructure Projects. The most common topics and skills that interviewers at ARSS Infrastructure Projects expect are Project Management, AutoCAD, Budgeting, Civil Engineering and Civil Project Management.
What are the top questions asked in ARSS Infrastructure Projects Project Manager interview for experienced candidates?

Some of the top questions asked at the ARSS Infrastructure Projects Project Manager interview for experienced candidates -

  1. Regarding other RCC structural activitie...read more
  2. Regarding well foundation & pile foundation...read more

Tell us how to improve this page.

ARSS Infrastructure Projects Project Manager Salary
based on 6 salaries
₹8.4 L/yr - ₹12 L/yr
35% less than the average Project Manager Salary in India
View more details

ARSS Infrastructure Projects Project Manager Reviews and Ratings

based on 5 reviews

3.5/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

2.5

Salary

2.7

Job security

2.5

Company culture

2.6

Promotions

2.7

Work satisfaction

Explore 5 Reviews and Ratings
Civil Site Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Site Engineer
11 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
8 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Store Incharge
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview