I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
PT slab refers to post-tensioned slab, a type of reinforced concrete slab.
PT slabs are reinforced with high-strength steel tendons that are tensioned after the concrete has been poured.
This technique allows for thinner and lighter slabs with longer spans.
PT slabs are commonly used in high-rise buildings, parking garages, and bridges.
The tendons are typically arranged in a grid pattern and anchored to the edges of the s...
Construction of malls involves various structural engineering aspects such as foundation design, seismic considerations, and load-bearing capacity.
Designing the foundation to support the weight of the building and its contents
Considering seismic activity and designing the structure to withstand earthquakes
Ensuring the load-bearing capacity of the structure is sufficient for the intended use
Incorporating fire safety mea...
Quaity Control Engineer
5
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Junior Project Manager
3
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure