i
Alphawave Semi
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.
Online Test which consists of Aptitude, Reasoning, Electronic Circuits and PD questions
Physical Design flow involves multiple stages with various checks to ensure design quality and manufacturability.
Synthesis: Logic synthesis to convert RTL to gate-level netlist.
Floorplanning: Define chip area, placement of blocks, and power grid.
Placement: Place standard cells in the floorplan area.
Clock Tree Synthesis: Build clock distribution network for timing.
Routing: Connect the placed cells with metal layers.
Desi...
I am a dedicated and experienced Physical Design Engineer with a strong background in designing and optimizing integrated circuits.
I have a Bachelor's degree in Electrical Engineering from XYZ University.
I have worked at ABC Semiconductor for 5 years, where I led the physical design team for multiple successful projects.
I am proficient in tools like Cadence Virtuoso and Synopsys ICC.
I have a strong understanding of tim...
NAND gate can be implemented using CMOS technology, which involves using both NMOS and PMOS transistors in parallel.
NAND gate consists of multiple transistors connected in series and parallel to achieve the desired logic function.
In CMOS implementation, NMOS transistors are used for the pull-down network while PMOS transistors are used for the pull-up network.
When any of the inputs is low, the corresponding NMOS transi...
Top trending discussions
posted on 26 Nov 2024
I was interviewed in Oct 2024.
The PD flow is the process of designing the physical layout of integrated circuits.
Initial floorplanning to determine the placement of blocks and macros
Placement and optimization of standard cells
Routing of interconnects to connect the various components
Physical verification to ensure design rules are met
Timing closure to meet performance targets
Setup and hold violations can be fixed by adjusting timing constraints, optimizing clock tree, and redesigning critical paths.
Adjust timing constraints to allow more time for signals to propagate
Optimize clock tree to reduce clock skew and improve timing
Redesign critical paths by adding buffers or restructuring logic
Use ECO (Engineering Change Order) to make necessary changes without redoing the entire design
My domain expertise is in physical design engineering, specifically in the areas of floorplanning, placement, routing, and timing closure.
Floorplanning
Placement
Routing
Timing closure
Setup and hold time violations can occur on the same path due to different reasons.
Timing violations can occur due to variations in process, voltage, and temperature (PVT)
Clock skew between different paths can lead to setup and hold violations on the same path
Issues with clock tree synthesis or routing can also contribute to setup and hold time violations
Improper constraints or incorrect timing analysis setup can resul
posted on 22 Aug 2024
I applied via LinkedIn and was interviewed in Jul 2024. There was 1 interview round.
posted on 10 Jul 2024
Yes, setup and hold uncertainty values are different in physical design engineering.
Setup uncertainty is related to the arrival time of the data signal at the input of the flip-flop, while hold uncertainty is related to the removal time of the data signal.
Setup time is the minimum amount of time the data input must be stable before the clock edge, while hold time is the minimum amount of time the data input must be sta...
posted on 11 Oct 2023
I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
PD inputs are design specifications and constraints, while outputs are physical layout of the design.
Inputs include design specifications, constraints, technology libraries, and floorplan.
Outputs include physical layout, placement of components, routing of wires, and design verification.
Example: Input - RTL design, clock frequency, power constraints. Output - GDSII layout, timing analysis report.
PNR flow consists of synthesis, floorplanning, placement, clock tree synthesis, routing, and signoff stages.
Synthesis: Convert RTL code to gate-level netlist
Floorplanning: Define chip area, core, and I/O locations
Placement: Place gates in specific locations to meet timing constraints
Clock tree synthesis: Create clock distribution network
Routing: Connect gates with wires while considering timing and congestion
Signoff: V...
Techniques to minimize congestion include buffer insertion, wire spreading, and layer assignment.
Buffer insertion: Adding buffers to critical paths to improve timing and reduce congestion.
Wire spreading: Distributing wires evenly to reduce congestion in specific areas.
Layer assignment: Properly assigning different signal layers to reduce congestion on a single layer.
Setup and hold time are timing constraints in digital circuits. Techniques to fix violations include adjusting clock skew, buffering signals, and optimizing routing.
Setup time is the minimum amount of time a data input must be stable before the clock edge for proper operation.
Hold time is the minimum amount of time a data input must be stable after the clock edge for proper operation.
Techniques to fix setup and hold ti...
Signal integrity refers to the quality of an electrical signal as it travels through a circuit or system.
It involves ensuring that the signal remains clear and undistorted from the transmitter to the receiver.
Factors affecting signal integrity include impedance matching, noise, crosstalk, and reflections.
Signal integrity analysis is crucial in high-speed digital design to prevent data errors and ensure reliable communi...
Crosstalk is unwanted interference between signals on adjacent lines, while noise is random unwanted signals that can degrade performance.
Crosstalk occurs when signals on adjacent lines interfere with each other due to coupling effects.
Noise is random unwanted signals that can be caused by various sources such as electromagnetic interference or power supply fluctuations.
To fix crosstalk, techniques like spacing out lin...
Clock latency is the delay between the clock signal being generated and reaching the destination, skew is the variation in arrival times of the clock signal at different destinations, and jitter is the variation in the period of the clock signal.
Clock latency is the delay between the clock signal being generated and reaching the destination.
Skew is the variation in arrival times of the clock signal at different destina...
Useful skew, negative skew, and positive skew are terms used in physical design to describe timing constraints.
Useful skew refers to intentional delay added to certain paths to meet timing requirements.
Negative skew occurs when data arrives later than expected, leading to potential timing violations.
Positive skew occurs when data arrives earlier than expected, potentially causing setup time violations.
Skew can be adjus...
posted on 7 Apr 2023
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.
ICG stands for Inter-Chip Global. It is a network that connects multiple chips in a system.
ICG is used to transfer data between different chips in a system
It helps in reducing the number of wires required for communication between chips
ICG can be used in various design aspects such as clock distribution, power management, and data transfer
Example: In a multi-chip system, ICG can be used to transfer clock signals from o
MSCTS can help in achieving better clock distribution and reducing skew at SOC level CTS.
MSCTS (Multi-Source Clock Tree Synthesis) can optimize the clock tree for better skew and jitter performance.
It can also help in reducing power consumption by optimizing the clock network.
MSCTS can handle multiple clock sources and ensure proper synchronization.
It can also help in meeting timing constraints and reducing clock tree ...
Fixing setup and hold time violations simultaneously requires adjusting clock timing and/or data path delays.
Identify the critical path causing the violations
Adjust the clock timing to meet setup and hold requirements
Adjust the data path delays to meet setup and hold requirements
Use tools like static timing analysis and delay calculation to determine necessary adjustments
Iteratively adjust timing and delays until viola
posted on 1 Nov 2022
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
posted on 2 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Integrating and differentiating signals through software embedded C for 8-bit and 16-bit architecture involves utilizing appropriate data types and algorithms.
Use fixed-point arithmetic for 8-bit architecture to maintain precision
Leverage floating-point arithmetic for 16-bit architecture for higher precision
Implement algorithms like finite difference method for differentiation
Utilize digital signal processing technique...
Digital filters can be implemented through software by using algorithms such as Finite Impulse Response (FIR) or Infinite Impulse Response (IIR).
Choose the appropriate filter type based on the desired frequency response and computational complexity
Implement the filter algorithm in the firmware code using programming languages like C or assembly
Optimize the filter design for efficient memory usage and processing speed
Te...
posted on 26 Nov 2024
I was interviewed in Oct 2024.
The PD flow is the process of designing the physical layout of integrated circuits.
Initial floorplanning to determine the placement of blocks and macros
Placement and optimization of standard cells
Routing of interconnects to connect the various components
Physical verification to ensure design rules are met
Timing closure to meet performance targets
Setup and hold violations can be fixed by adjusting timing constraints, optimizing clock tree, and redesigning critical paths.
Adjust timing constraints to allow more time for signals to propagate
Optimize clock tree to reduce clock skew and improve timing
Redesign critical paths by adding buffers or restructuring logic
Use ECO (Engineering Change Order) to make necessary changes without redoing the entire design
My domain expertise is in physical design engineering, specifically in the areas of floorplanning, placement, routing, and timing closure.
Floorplanning
Placement
Routing
Timing closure
Setup and hold time violations can occur on the same path due to different reasons.
Timing violations can occur due to variations in process, voltage, and temperature (PVT)
Clock skew between different paths can lead to setup and hold violations on the same path
Issues with clock tree synthesis or routing can also contribute to setup and hold time violations
Improper constraints or incorrect timing analysis setup can resul
L2 Engineer
4
salaries
| ₹19 L/yr - ₹30 L/yr |
Asic Design Engineer
3
salaries
| ₹1 L/yr - ₹17 L/yr |
Senior Physical Design Engineer
3
salaries
| ₹30 L/yr - ₹45 L/yr |