i
Afcons Infrastructure
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2021. There were 3 interview rounds.
The procedure for implementing Traffic Diversion work involves several steps.
Conduct a traffic survey to identify the areas that need diversion
Plan the diversion routes and communicate them to the public
Implement the diversion by putting up signs and barriers
Monitor the traffic flow and make adjustments as necessary
Remove the diversion once the work is completed
Approval from local authorities and relevant stakeholders is required for Traffic Management plan/Traffic Diversion work in construction.
Approval from local council or municipality is required
Approval from relevant stakeholders such as police, fire department, and ambulance services may also be required
The approval process may involve submitting a detailed traffic management plan outlining the proposed traffic diversio...
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
Wood governing refers to the regulations and standards that govern the use of wood in construction and engineering projects.
Wood governing includes codes, standards, and regulations related to the design, construction, and maintenance of wooden structures.
Knowledge of wood governing is important for ensuring compliance with safety and quality standards in engineering projects.
Examples of wood governing organizations in...
Maintaining furnace draft involves controlling air flow to ensure proper combustion and heat transfer.
Regularly clean and inspect the furnace and chimney to prevent blockages
Adjust the damper to control the amount of air entering the furnace
Use a draft gauge to monitor and adjust draft pressure
Install a barometric damper to automatically regulate draft pressure
Consider installing a draft inducer to improve draft in low
based on 1 review
Rating in categories
Senior Engineer
377
salaries
| ₹5 L/yr - ₹19 L/yr |
Planning Engineer
195
salaries
| ₹4.5 L/yr - ₹13 L/yr |
Civil Engineer
189
salaries
| ₹2 L/yr - ₹10.8 L/yr |
Executive Engineer
172
salaries
| ₹3.2 L/yr - ₹12 L/yr |
Engineer
153
salaries
| ₹2.2 L/yr - ₹10.8 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company