Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare
4.3

based on 2.4k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Project Executive Engineer Interview Questions and Answers

Updated 21 Sep 2020

Afcons Infrastructure Project Executive Engineer Interview Experiences

1 interview found

Interview Questionnaire 

3 Questions

  • Q1. Why u join this company??
  • Q2. What u have any technical skills?
  • Q3. Why u choose this field and tell me any five rock project this field.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the total experience
  • Q2. Your current CTC
Round 2 - Technical 

(2 Questions)

  • Q1. How much type of project
  • Q2. What was the memorable work
Round 3 - One-on-one 

(2 Questions)

  • Q1. Your Designation in this company
  • Q2. What is the look after
Round 4 - HR 

(2 Questions)

  • Q1. Your Notice period
  • Q2. Your expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - We have work on target base so that All work should be complete in time frame
And all Documents work should be complete according to work, otherwise your hard work is in vain.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. More on operational concerns

Interview Preparation Tips

Interview preparation tips for other job seekers - get your best in the beginning, later nothing happens
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Question about project

Round 2 - HR 

(6 Questions)

  • Q1. Question about salary, joining date
  • Q2. Question for salary, joining date 85000 Per month, immediately
  • Q3. Question for duty from house Duti from house
  • Q4. Question for vehicle Motorcycle
  • Q5. Question for food in mesh or house Both
  • Q6. Joining immediately

Interview Preparation Tips

Topics to prepare for Tata Projects Project Manager Civil interview:
  • Site Management
Interview preparation tips for other job seekers - I advice you for immediate joining
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI
Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and character
Round 2 - Technical 

(1 Question)

  • Q1. Experience details

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 419 Interviews
KEC International Interview Questions
4.1
 • 294 Interviews
TCE Interview Questions
3.8
 • 245 Interviews
Saint-Gobain Interview Questions
4.0
 • 171 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
View all
Senior Engineer
483 salaries
unlock blur

₹5.6 L/yr - ₹19 L/yr

Planning Engineer
198 salaries
unlock blur

₹4.5 L/yr - ₹12 L/yr

Civil Engineer
183 salaries
unlock blur

₹2.4 L/yr - ₹9.9 L/yr

Executive Engineer
171 salaries
unlock blur

₹3.2 L/yr - ₹12 L/yr

Engineer
155 salaries
unlock blur

₹2.2 L/yr - ₹10.3 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview