I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
Cost control in maintenance involves monitoring and managing expenses related to maintenance activities.
Parameters considered include labor costs, material costs, equipment costs, and overhead costs.
Regular maintenance can help prevent costly repairs and replacements.
Implementing a computerized maintenance management system (CMMS) can help track expenses and identify areas for cost savings.
Outsourcing maintenance work ...
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Campus Placement
Simple aptitude questions and logical reasoning
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Ind AS 116 is a new accounting standard for lease accounting.
Ind AS 116 replaces the previous standard Ind AS 17.
It requires lessees to recognize all leases on their balance sheet.
Lessees must also separate lease components from non-lease components.
It impacts financial statements, ratios, and covenants.
It became effective from April 1, 2019.
Example: A company leasing a building must recognize the lease liability and r
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
I was interviewed before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
based on 2 reviews
Rating in categories
Senior Engineer
389
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
195
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
181
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
172
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA