Adani Group Test Engineer Interview Questions and Answers

Updated 16 Feb 2022

Adani Group Test Engineer Interview Experiences

1 interview found

Test Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Feb 2022

I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is sld and how to create
  • Ans. 

    SLD stands for System Level Design. It is a process of designing a system at a high level of abstraction.

    • SLD is the first step in the design process

    • It involves defining the system's requirements and architecture

    • SLD helps in identifying the major components of the system and their interactions

    • Creating an SLD involves creating diagrams and flowcharts to represent the system

  • Answered by AI
  • Q2. What is the basic parameters of layout
  • Ans. 

    Layout parameters include size, spacing, alignment, and orientation.

    • Size refers to the dimensions of the layout

    • Spacing refers to the distance between elements in the layout

    • Alignment refers to the positioning of elements relative to each other

    • Orientation refers to the direction of the layout, such as horizontal or vertical

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company and good work environment and nice growth

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Senior Engineer Interview Questions & Answers

Suzlon Group user image Abhishek Bagwan (ABHI)

posted on 25 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(22 Questions)

  • Q1. Can you provide an introduction about yourself?
  • Ans. 

    Experienced Senior Engineer with a strong background in software development and project management.

    • Over 10 years of experience in designing and implementing complex software solutions

    • Proficient in multiple programming languages such as Java, Python, and C++

    • Led cross-functional teams to successfully deliver projects on time and within budget

    • Strong problem-solving skills and ability to adapt to new technologies quickly

  • Answered by AI
  • Q2. Can you provide details about your work experience?
  • Ans. 

    I have over 10 years of experience in designing and implementing complex engineering solutions.

    • Designed and implemented various engineering solutions for different projects

    • Led a team of engineers to successfully complete a major project ahead of schedule

    • Collaborated with cross-functional teams to ensure project success

    • Utilized advanced engineering tools and techniques to optimize project outcomes

  • Answered by AI
  • Q3. What do you know about Doubly Fed Induction Generators?
  • Ans. 

    Doubly Fed Induction Generators (DFIGs) are commonly used in wind turbines to allow variable speed operation and improve efficiency.

    • DFIGs have two sets of windings - one on the stator and one on the rotor

    • The rotor windings are fed with variable frequency AC power through slip rings and brushes

    • DFIGs allow for control of both active and reactive power output

    • They are more efficient than fixed speed induction generators

    • DFI...

  • Answered by AI
  • Q4. What is the importance of circuit diagrams in electrical engineering?
  • Ans. 

    Circuit diagrams are essential in electrical engineering for visualizing and understanding complex circuits.

    • Circuit diagrams provide a visual representation of the connections and components in a circuit.

    • They help engineers analyze and troubleshoot circuits more efficiently.

    • Circuit diagrams aid in the design and construction of electrical systems.

    • They are crucial for documenting and communicating circuit designs to oth...

  • Answered by AI
  • Q5. What is the procedure for reading a wiring diagram?
  • Ans. 

    Reading a wiring diagram involves understanding symbols, following the flow of current, and identifying components.

    • Start by familiarizing yourself with the symbols used in the diagram.

    • Follow the flow of current from the power source to the components.

    • Identify the different components and their connections based on the diagram.

    • Pay attention to the color codes and labels for wires and components.

    • Refer to the legend or ke...

  • Answered by AI
  • Q6. What is an IGBT, how does it work, and what is the importance of diode capacitors in its functionality?
  • Ans. 

    IGBT stands for Insulated Gate Bipolar Transistor, a semiconductor device used for switching applications in power electronics.

    • IGBT is a type of power semiconductor device that combines the high efficiency of a MOSFET with the high current and low saturation voltage capability of a bipolar transistor.

    • It consists of three terminals: gate, collector, and emitter.

    • IGBT works by controlling the flow of current between the c...

  • Answered by AI
  • Q7. Can you provide training to your team?
  • Ans. 

    Yes, I have experience providing training to my team.

    • I have conducted training sessions on new technologies and tools for my team.

    • I have created training materials such as presentations, manuals, and hands-on exercises.

    • I have mentored junior team members to help them improve their skills.

    • I have received positive feedback from team members on the effectiveness of my training sessions.

  • Answered by AI
  • Q8. What are your computer skills?
  • Ans. 

    Proficient in various programming languages and software tools, with experience in database management and system administration.

    • Proficient in programming languages such as Java, Python, and C++

    • Experience with database management systems like MySQL and MongoDB

    • Skilled in system administration tasks including network configuration and troubleshooting

    • Familiar with software tools such as Git, Jenkins, and Docker

  • Answered by AI
  • Q9. How frequently are you able to climb towers as part of your job requirements?
  • Ans. 

    I climb towers as part of my job requirements on a regular basis.

    • I climb towers for routine maintenance checks

    • I climb towers to install or repair equipment

    • I climb towers to conduct inspections or surveys

    • On average, I climb towers at least once a month

  • Answered by AI
  • Q10. What is your understanding of the balance of plant (BOP)?
  • Ans. 

    BOP refers to the systems and equipment outside of the main power generating unit in a power plant.

    • BOP includes components like transformers, switchgear, cooling systems, and fuel systems.

    • It is essential for the overall functioning of the power plant.

    • BOP is responsible for supporting the main power generation unit and ensuring its efficient operation.

    • Examples of BOP components are water treatment systems, piping, and c

  • Answered by AI
  • Q11. What are SCADA (Supervisory Control and Data Acquisition) systems and PLC (Programmable Logic Controllers)?
  • Ans. 

    SCADA systems are used to monitor and control industrial processes, while PLCs are programmable devices used to automate machinery and processes.

    • SCADA systems gather and analyze real-time data from sensors and equipment in industrial settings.

    • SCADA systems allow operators to remotely monitor and control processes, alarms, and events.

    • PLCs are programmable devices used to automate machinery and processes based on input f...

  • Answered by AI
  • Q12. Can you create a controlling circuit diagram based on my specifications?
  • Ans. 

    Yes, I can create a controlling circuit diagram based on your specifications.

    • I will need detailed specifications including input/output requirements, components to be used, and any specific constraints.

    • I will create a schematic diagram using software like Eagle, Altium, or KiCad.

    • I will ensure the circuit meets safety standards and is optimized for performance.

    • I will provide documentation including a bill of materials a

  • Answered by AI
  • Q13. What is the difference between synchronous and asynchronous generators?
  • Ans. 

    Synchronous generators produce electricity at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.

    • Synchronous generators are connected to the grid and produce electricity at a fixed frequency, typically 50 or 60 Hz.

    • Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.

    • Synchronous generators are commonly us...

  • Answered by AI
  • Q14. What is the Standard Operating Procedure (SOP)?
  • Ans. 

    SOP is a set of step-by-step instructions compiled by an organization to help workers carry out routine operations.

    • SOP is a detailed document that outlines the procedures and processes to be followed in specific situations.

    • It ensures consistency and quality in the performance of tasks.

    • SOPs are used in various industries such as healthcare, manufacturing, and IT.

    • Examples include a SOP for handling customer complaints in...

  • Answered by AI
  • Q15. Are you familiar with DGR, MGR, or YGR?
  • Ans. 

    DGR, MGR, and YGR are commonly used acronyms in the engineering field.

    • DGR stands for Design Gross Rating, which is the maximum allowable weight for a designed structure.

    • MGR stands for Maximum Gross Rating, which is the maximum weight a vehicle can carry including its own weight.

    • YGR could refer to Yield Gross Rating, but context is needed to determine its specific meaning.

  • Answered by AI
  • Q16. Are you knowledgeable about Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR)?
  • Ans. 

    Yes, I am knowledgeable about MTBF and MTTR in the context of engineering.

    • MTBF refers to the average time between failures of a system or component.

    • MTTR is the average time it takes to repair a failed system or component.

    • Both metrics are important in assessing the reliability and maintenance needs of engineering systems.

    • For example, a server may have an MTBF of 10,000 hours and an MTTR of 2 hours.

  • Answered by AI
  • Q17. What is more important for system reliability, Mean Time Between Failures (MTBF) or Mean Time to Repair (MTTR)?
  • Ans. 

    MTTR is more important for system reliability as it directly impacts downtime and overall system availability.

    • MTTR directly impacts downtime and system availability

    • MTBF is important for predicting failures but does not address how quickly the system can be restored

    • Focusing on reducing MTTR can lead to improved system reliability and performance

  • Answered by AI
  • Q18. What is the function of a Doubly-Fed Induction Generator (DFIG) when used with an asynchronous generator?
  • Ans. 

    DFIG controls the active and reactive power independently, improving efficiency and stability in wind turbines.

    • DFIG allows for variable speed operation, improving efficiency in wind turbines.

    • It controls the active and reactive power independently, enhancing stability.

    • DFIG can provide grid support by injecting or absorbing reactive power as needed.

    • It is commonly used in wind turbines to improve power quality and grid in...

  • Answered by AI
  • Q19. What is slip in a generator?
  • Ans. 

    Slip in a generator refers to the difference between synchronous speed and actual rotor speed.

    • Slip is necessary for the generation of electrical power in a generator.

    • It is calculated as (Synchronous speed - Actual speed) / Synchronous speed.

    • Slip is typically expressed as a percentage.

    • Higher slip values indicate lower efficiency in the generator.

    • For example, in an induction generator, slip is essential for inducing curr

  • Answered by AI
  • Q20. What can you explain about sub-synchronous, synchronous, and super-synchronous speeds?
  • Ans. 

    Sub-synchronous, synchronous, and super-synchronous speeds refer to different speeds at which a rotating machine can operate in relation to the system frequency.

    • Sub-synchronous speed: When the machine speed is less than the synchronous speed, typically caused by a mechanical fault or system resonance.

    • Synchronous speed: When the machine speed matches the system frequency, commonly seen in normal operating conditions.

    • Sup...

  • Answered by AI
  • Q21. Importance of hub system, Nacelle system in wind turbine ?
  • Ans. 

    Hub system and Nacelle system are crucial components in a wind turbine for efficient energy generation.

    • The hub system connects the blades to the main shaft of the turbine, allowing for rotation and energy generation.

    • The Nacelle system houses the gearbox, generator, and other key components necessary for converting wind energy into electricity.

    • Proper maintenance and monitoring of these systems are essential for optimal ...

  • Answered by AI
  • Q22. About documentation
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How much distribution voltage
  • Ans. 

    Distribution voltage refers to the voltage level at which electricity is distributed from substations to consumers.

    • Distribution voltage typically ranges from 4 kV to 33 kV for residential and commercial areas.

    • Higher distribution voltages, such as 66 kV or 132 kV, are used for industrial areas or large consumers.

    • The choice of distribution voltage depends on factors like distance, load requirements, and cost.

    • Transformers...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About my academic
  • Q2. About salary & family background
Round 2 - Technical 

(2 Questions)

  • Q1. About college project
  • Q2. Some discussion on college studies

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Basic questions about production
Round 3 - Technical 

(1 Question)

  • Q1. Interview by production AGM
Round 4 - HR 

(1 Question)

  • Q1. HR related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - If they require then they will hire you with basic knowledge of your field
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Online Aptitude test with GK, quant and domain knowledge

Round 2 - Technical 

(2 Questions)

  • Q1. Explain how transformer functions
  • Ans. 

    A transformer functions by transferring electrical energy between two or more circuits through electromagnetic induction.

    • Transformers consist of two coils of wire, known as the primary and secondary coils.

    • When an alternating current flows through the primary coil, it creates a changing magnetic field.

    • This changing magnetic field induces a voltage in the secondary coil, transferring electrical energy between the two cir...

  • Answered by AI
  • Q2. Why core company?

Interview Preparation Tips

Topics to prepare for Adani Power Senior Engineer interview:
  • Electrical Machines
Interview preparation tips for other job seekers - Be confident, prepare the domain properly

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Common way of demolition
  • Ans. 

    Common way of demolition is through controlled implosion.

    • Controlled implosion is a method where explosives are strategically placed to bring down a structure in a controlled manner.

    • Another common method is mechanical demolition using equipment like wrecking balls, excavators, or bulldozers.

    • Selective demolition involves dismantling specific parts of a structure while leaving the rest intact.

    • Deconstruction is a sustainab...

  • Answered by AI
  • Q2. Vibration time of concrete
  • Ans. 

    Vibration time of concrete is the duration for which concrete is vibrated to remove air bubbles and ensure proper compaction.

    • Vibration time varies based on factors like mix design, slump, size of pour, and type of vibrator used.

    • Typically, vibration time ranges from 10-30 seconds per foot of concrete thickness.

    • Over-vibration can lead to segregation of aggregates, while under-vibration can result in honeycombing.

    • Proper v...

  • Answered by AI

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What are your roles in your current job
  • Ans. Explaned about my roles and responsibilities
  • Answered Anonymously
  • Q2. How do you tackle vibrations in axial fans
  • Ans. 

    To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.

    • Perform dynamic balancing of the fan blades to minimize vibrations.

    • Ensure proper alignment of the fan with the motor and the surrounding structure.

    • Regularly inspect and maintain the fan components to prevent wear and tear.

    • Use vibration analysis techniques to identify and address any potential issues.

    • Consider installing vibrat...

  • Answered by AI
  • Q3. What are the challenges you faced your job
  • Ans. Explained about our ID fan hydro coupling issue
  • Answered Anonymously
  • Q4. What permit system do you follow
  • Ans. 

    We follow a permit system based on the project requirements and local regulations.

    • Our permit system ensures compliance with safety standards and legal requirements.

    • We obtain permits for activities such as construction, electrical work, and hazardous material handling.

    • The specific permit requirements vary depending on the nature of the project and the location.

    • We work closely with regulatory authorities to ensure timely...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Know the constraints in your answer so that interviewer not go further into particular topic

Adani Group Interview FAQs

How many rounds are there in Adani Group Test Engineer interview?
Adani Group interview process usually has 2 rounds. The most common rounds in the Adani Group interview process are Resume Shortlist and Technical.
What are the top questions asked in Adani Group Test Engineer interview?

Some of the top questions asked at the Adani Group Test Engineer interview -

  1. What is the basic parameters of lay...read more
  2. What is sld and how to cre...read more

Tell us how to improve this page.

Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
ITC Interview Questions
3.9
 • 548 Interviews
Tata Group Interview Questions
4.2
 • 359 Interviews
Adani Power Interview Questions
3.9
 • 221 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
View all

Adani Group Test Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

2.0

Salary

5.0

Job security

2.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
754 salaries
unlock blur

₹6 L/yr - ₹18.5 L/yr

Deputy Manager
505 salaries
unlock blur

₹6.4 L/yr - ₹20.7 L/yr

Associate Manager
278 salaries
unlock blur

₹10 L/yr - ₹29 L/yr

Manager
243 salaries
unlock blur

₹11 L/yr - ₹34 L/yr

Senior Engineer
231 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Adani Group with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

NTPC

4.2
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview