I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Quantity surveyors play a crucial role in road projects by estimating costs, managing budgets, and ensuring project efficiency.
Estimating costs for materials, labor, and equipment
Preparing tender documents and contracts
Managing project budgets and costs
Conducting cost analysis and value engineering
Ensuring compliance with regulations and specifications
Providing financial advice and risk management
Collaborating with eng...
Billing is the process of creating and sending invoices to clients for services or products provided.
Prepare detailed breakdown of costs incurred
Calculate quantities and rates for each item
Include any additional charges or discounts
Generate invoice and send to client for payment
Track payments and follow up on overdue invoices
Inputs for Cost Estimations include project scope, materials, labor costs, equipment costs, overhead costs, and profit margin.
Project scope: Detailed understanding of the project requirements and deliverables.
Materials: Cost of all materials required for the project.
Labor costs: Cost of labor required to complete the project.
Equipment costs: Cost of any equipment or machinery needed for the project.
Overhead costs: Addi...
Top trending discussions
posted on 12 Feb 2024
I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
IS code for BBS is IS 1786:2008
IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction
Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects
posted on 17 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.
Rolling margin is used to measure the profitability of a business or project.
It helps in assessing the efficiency of operations and identifying areas for cost reduction.
The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.
For e...
If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.
I will review the drawings and specifications to ensure accuracy.
I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.
I will conduct a site visit to physically verify the quantities and compare them with the drawings.
If there are significant differences, I ...
Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.
Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.
It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.
BBS is prepared based on the structural drawings and specifications.
It includes the diameter, length, shape, and number of reinforcement bars required for the element.
BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.
It is an essential document for t...
Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.
Rate analysis involves breaking down the cost of each item in a construction project.
The cost of materials, labor, and equipment is analyzed to determine the overall cost.
Quantities of each item are measured and multiplied by their respective rates to calculate the cost.
Rate analysis helps in estimating ...
Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.
Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.
It is usually expressed as a percentage of the direct cost.
The margin for OH & Profits varies depending on the nature of the project and market conditions.
For example, if the direct cost of a proje...
The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.
Wastage percentage for reinforcement steel is typically estimated between 2-5%.
Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.
Proper planning, accurate cutting, and careful handling can help minimize wastage.
Examples of wastage include incorrect cu...
The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).
Structural steel is commonly used in the construction of buildings, bridges, and other structures.
The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.
Reinforced steel, also known as reba...
I was interviewed in Nov 2017.
Calculation of ducting in HVAC engineering involves determining the size, shape, and layout of ducts to ensure proper airflow and ventilation.
Calculate the required airflow rate based on the heating or cooling load of the space
Determine the friction loss in the ducts using the Darcy-Weisbach equation
Select the appropriate duct size based on the desired air velocity and pressure drop
Consider factors such as duct materia...
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 5 interview rounds.
It was around 5-10 minutes online test.
The percentage of wastage varies depending on the project and materials used.
The percentage of wastage can be calculated by dividing the amount of material wasted by the total amount of material used and multiplying by 100.
Factors that can contribute to wastage include poor planning, inaccurate measurements, and human error.
The percentage of wastage can be reduced through careful planning, accurate measurements, and pr...
posted on 26 Nov 2022
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
General mathematical question like work, force, percentage etc.
Secured advance in client billing is a payment made by the client to the contractor before the work is completed.
It is a form of pre-payment made by the client to the contractor
It is usually made to help the contractor cover the cost of materials and labor before the work is completed
The amount of the secured advance is usually a percentage of the total contract value
The contractor must provide security for the advance...
Shear force max depends on the material and cross-sectional shape of the beam.
Shear force max is the maximum force that a beam can withstand before it fails in shear.
It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.
It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.
Calculating shear force max requires ...
The wastage percentage varies depending on the type of work.
Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.
For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.
In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.
For painting work, the wastage percent...
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
219
salaries
| ₹3 L/yr - ₹11.1 L/yr |
Manager
124
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Field Engineer
124
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Site Engineer
93
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Civil Engineer
76
salaries
| ₹2.2 L/yr - ₹7.8 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company