Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aarvee Associates Team. If you also belong to the team, you can get access from here

Aarvee Associates Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 905 Reviews

Filter interviews by

Aarvee Associates Deputy Project Manager Interview Questions and Answers

Updated 17 Sep 2021

Aarvee Associates Deputy Project Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and character
Round 2 - Technical 

(1 Question)

  • Q1. Experience details
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel density, steel lap zone in column & beam, steel weight formula
  • Q2. Mivan shuttering, full plywood weight, table formwork
  • Q3. Excavation slope, aggregate density, cement density, mix design, compressive strength of cement & concrete, slump test,free flow concrete
Round 2 - BOQ 

(2 Questions)

  • Q1. Item wise rate analysis
  • Q2. How to manage lose Making item
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Maintenance, Service, oil
  • Q2. Polymer use, reuse, LG, HIRA, lifting plan
Round 2 - Technical 

(1 Question)

  • Q1. Lifting plan, tendum lifting, HIRA
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Basic questions
Round 2 - Group Discussion 

All experience relevant questions and what I will do the best in this company

Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family Background
  • Q2. Who is ur father etc…. Locality and all
  • Ans. 

    My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.

    • My father is a retired government official

    • He worked in the education department

    • We live in a peaceful neighborhood in the suburbs

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join … No relieveing letter or experience letter after serving notice period …. Wrost company
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package

Interview Questionnaire 

4 Questions

  • Q1. Role and responsiblity .
  • Q2. Good knowledge of working domain .
  • Q3. Efficient for team leading
  • Ans. 

    Efficient team leading requires clear communication, delegation, and motivation.

    • Establish clear goals and expectations

    • Delegate tasks based on team members' strengths

    • Provide regular feedback and recognition

    • Encourage open communication and collaboration

    • Lead by example and maintain a positive attitude

  • Answered by AI
  • Q4. Type of projects done in past exp and what were the outcomes

Aarvee Associates Interview FAQs

What are the top questions asked in Aarvee Associates Deputy Project Manager interview?

Some of the top questions asked at the Aarvee Associates Deputy Project Manager interview -

  1. If contractors not compliance spec. Then what do you want or take action agains...read more
  2. Asked about inspection that how to check quality of work...read more
  3. Asked about preparation of financial & physical progre...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Tata Projects Interview Questions
4.3
 • 401 Interviews
TCE Interview Questions
3.8
 • 240 Interviews
Apco Infratech Interview Questions
3.8
 • 111 Interviews
View all
Aarvee Associates Deputy Project Manager Salary
based on 10 salaries
₹9 L/yr - ₹15.3 L/yr
15% more than the average Deputy Project Manager Salary in India
View more details

Aarvee Associates Deputy Project Manager Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
216 salaries
unlock blur

₹3 L/yr - ₹10.1 L/yr

Field Engineer
131 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Manager
125 salaries
unlock blur

₹6.5 L/yr - ₹19 L/yr

Site Engineer
90 salaries
unlock blur

₹2.7 L/yr - ₹7 L/yr

Engineer
68 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Aarvee Associates with

Megha Engineering & Infrastructures

3.9
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview