Project material was controlled by creating a detailed plan and monitoring inventory levels.
Developed a comprehensive project plan that included material requirements and timelines
Monitored inventory levels to ensure materials were ordered and received in a timely manner
Collaborated with suppliers to ensure timely delivery of materials
Implemented a system to track material usage and waste
Regularly reviewed and updated ...
Materials are stored according to their specific requirements for preservation.
Materials are stored in appropriate containers or packaging to prevent damage or contamination.
Temperature and humidity levels are monitored and controlled as necessary.
Materials are labeled with information such as date received, expiration date, and storage requirements.
Regular inspections and inventory checks are conducted to ensure prope...
E&I panels should be stored in a dry and clean area with proper labeling.
Store panels in a dry and clean area to prevent damage from moisture and dirt.
Label the panels clearly to ensure easy identification and retrieval.
Store panels vertically to prevent warping or bending.
Use protective covers to prevent scratches or other damage.
Regularly inspect the panels for any signs of damage or wear.
Follow manufacturer's instru
As a Material Controller, I received material and documentation through various methods.
Received material through purchase orders and delivery notes.
Received documentation through email, physical copies, or online portals.
Verified the accuracy of material and documentation against the purchase order or request.
Checked for any damages or discrepancies and reported them to the appropriate department.
Maintained a record o...
Materials are inspected by following established procedures and using appropriate tools and equipment.
Inspect materials upon receipt to ensure they meet specifications
Use measuring tools such as calipers and micrometers to check dimensions
Perform visual inspections for defects or damage
Conduct tests to verify material properties
Document inspection results and report any issues to appropriate personnel
My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.
Regular safety audits to identify potential hazards and address them promptly
Employee training on safety procedures and protocols
Strict adherence to safety protocols to minimize the risk of accidents
Proper use of personal protective equipment (PPE)
Emergency response plan in place in case of accidents or incidents
C...
posted on 8 Jun 2022
posted on 8 Jun 2022
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
Technical difficulties in site
Equipment malfunction
Material shortage
Environmental factors
Human error
Lack of proper planning
Communication breakdown
Technical difficulties in the lab can arise due to various reasons.
Equipment malfunction
Lack of proper calibration
Contamination of samples
Human error
Power outages
Insufficient resources
Inadequate training
Environmental factors
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
posted on 25 Sep 2021
I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.
based on 2 reviews
Rating in categories
Assistant Manager
216
salaries
| ₹3 L/yr - ₹10.1 L/yr |
Field Engineer
131
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Manager
125
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Site Engineer
90
salaries
| ₹2.7 L/yr - ₹7 L/yr |
Engineer
68
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company