Upload Button Icon Add office photos

Aarti Industries

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Aarti Industries Project Engineer Interview Questions, Process, and Tips

Updated 12 Sep 2023

Top Aarti Industries Project Engineer Interview Questions and Answers

Aarti Industries Project Engineer Interview Experiences

3 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Basic details about instrumentation and execution of instruments
  • Q2. Asked about Safety system
  • Q3. Tell me about the parts of control valve?
  • Ans. 

    Control valve consists of parts like valve body, actuator, positioner, and trim.

    • Valve body: main housing that contains the flow passage and seat

    • Actuator: device that adjusts the position of the valve plug

    • Positioner: controls the valve position based on input signals

    • Trim: internal components that control flow through the valve

  • Answered by AI
  • Q4. What is the working principle of mass flow meter?
  • Ans. 

    Mass flow meter works on the principle of measuring the mass flow rate of a fluid passing through a tube.

    • Mass flow meter measures the mass flow rate of a fluid, unlike traditional flow meters which measure volume flow rate.

    • It operates based on the principle of Coriolis effect, thermal dispersion, or pressure drop.

    • Coriolis mass flow meters use the twisting force generated by the fluid's mass flow to measure flow rate.

    • Th...

  • Answered by AI
  • Q5. What is the 2 out of 3 logic?
  • Ans. 

    2 out of 3 logic is a system where a decision is made based on the agreement of at least 2 out of 3 inputs.

    • In 2 out of 3 logic, a decision is made based on the majority agreement of 3 inputs.

    • For example, if 2 out of 3 inputs are 'true', the overall decision would be 'true'.

    • This logic is commonly used in voting systems and fault-tolerant systems.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarti Industries Project Engineer interview:
  • Sap basic
  • Instrumentation Engineering
  • Project Execution
  • PSM
  • Work Permit System

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to your background and job profile.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared your privious job role activity and all.

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

I applied via Campus Placement and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much Ton material you fabricated with time span with final excution
  • Ans. 

    I have fabricated X tons of material within Y time span with successful execution.

    • Amount of material fabricated

    • Time span for fabrication

    • Execution success rate

  • Answered by AI
  • Q2. What is PMO and how it works
  • Ans. 

    PMO stands for Project Management Office. It is a centralized department that oversees project management across an organization.

    • PMO provides guidance, support, and standards for project management

    • It ensures that projects are aligned with the organization's goals and objectives

    • PMO monitors project progress and provides regular reports to stakeholders

    • It also manages resources, budgets, and risks associated with projects

    • ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic and good knowledge of piping

Interview questions from similar companies

Senior Engineer Interview Questions & Answers

SRF user image Veeravalli Lakshmiprasad

posted on 17 Oct 2019

I applied via Naukri.com and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. R22 production
  • Q2. HCl scrubbing,Neutralisation column
  • Q3. Distillation columns,compressors and their trouble shooting

Interview Preparation Tips

Interview preparation tips for other job seekers - On Aug 17,2019..I attended an interview for the post of Senior Production Engineer in SRF,Dahej,Gujarat.I am fortunate enough that I have got very similar process experience that what SRF is manufacturing.Being a professional chemical engineer for 7 years in Hindustan Fluorocarbons Ltd,I answered almost all the questions for what the interview panel had asked me.Infact I prepared for more Monomer plant questions but they confined to R22 plant only.Then later asked about my family background and raised concerns about my relocation to gujarat for the reason being that my wife works in Infosys,Hyderabad.My wife has the facility to work from home hence I assured them of my relocation to Gujarat if given the opportunity.But HR Divya Chauhan has put it ON HOLD for the same reason.Thanks for their wonderful hospitality and flight charges reimbursement.Definitely one day I will join in SRF and explore myself to the better challenges.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Basics of instrumentation, control system, field instrumentation, job role
Round 3 - Technical 

(1 Question)

  • Q1. Overall plant proceess, job role, manpower handling and budget
Round 4 - HR 

(1 Question)

  • Q1. Family background and reason for chamge
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Unit of pressure. Types of pressure.
  • Ans. 

    Unit of pressure is Pascal. Types of pressure include atmospheric, gauge, absolute, and differential.

    • Unit of pressure is Pascal (Pa)

    • Types of pressure include atmospheric pressure, gauge pressure, absolute pressure, and differential pressure

    • Atmospheric pressure is the pressure exerted by the weight of the atmosphere

    • Gauge pressure is the pressure measured relative to atmospheric pressure

    • Absolute pressure is the pressure ...

  • Answered by AI
  • Q2. P&ID, GA and piping layout related question.
  • Q3. What do you know about the company?
  • Ans. 

    The company is a leading engineering firm specializing in construction projects.

    • Specializes in construction projects

    • Known for innovative engineering solutions

    • Has a strong reputation in the industry

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Tell me something about yourself?
  • Q2. What are the strengths?
  • Ans. 

    My strengths include strong problem-solving skills, excellent communication abilities, and a proven track record of successful project management.

    • Strong problem-solving skills - able to analyze complex issues and develop effective solutions

    • Excellent communication abilities - able to effectively communicate with team members, stakeholders, and clients

    • Proven track record of successful project management - able to plan, e...

  • Answered by AI
  • Q3. Why are you interested in this job?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is your current profile?

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. MSDS,WORK TO PERMIT, PREVIOUS COMPANY EXPERIENCE BASE TECHNICAL,
Round 2 - HR 

(1 Question)

  • Q1. Family background, education background, salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - MSDS, permit system, technical knowledge about previous experience.

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical ask abt subject line

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good experience and shortlisted

I applied via Naukri.com and was interviewed in Jun 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is your current job responsibility?

Interview Preparation Tips

Interview preparation tips for other job seekers - Speak the truth and say what ever you knew With confidence.
Contribute & help others!
anonymous
You can choose to be anonymous

Aarti Industries Interview FAQs

How many rounds are there in Aarti Industries Project Engineer interview?
Aarti Industries interview process usually has 1-2 rounds. The most common rounds in the Aarti Industries interview process are Technical and Resume Shortlist.
How to prepare for Aarti Industries Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aarti Industries. The most common topics and skills that interviewers at Aarti Industries expect are Root Cause Analysis, Project Implementation, Chemical, HSE and Housekeeping.
What are the top questions asked in Aarti Industries Project Engineer interview?

Some of the top questions asked at the Aarti Industries Project Engineer interview -

  1. Tell me about the parts of control val...read more
  2. What is the working principle of mass flow met...read more
  3. How much Ton material you fabricated with time span with final excut...read more

Recently Viewed

INTERVIEWS

Penthara Technologies

No Interviews

INTERVIEWS

Unicommerce Esolutions

No Interviews

INTERVIEWS

Iol Chemicals & Pharmaceuticals

No Interviews

INTERVIEWS

Amazon

No Interviews

INTERVIEWS

Infosys

No Interviews

INTERVIEWS

Traveloka

No Interviews

INTERVIEWS

SPRINKLR

No Interviews

INTERVIEWS

Gaboli

No Interviews

INTERVIEWS

Subros

No Interviews

INTERVIEWS

Wipro

No Interviews

Tell us how to improve this page.

Aarti Industries Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

SRF Interview Questions
4.2
 • 179 Interviews
UPL Interview Questions
4.1
 • 174 Interviews
PI Industries Interview Questions
4.0
 • 105 Interviews
Atul Interview Questions
3.9
 • 83 Interviews
Deepak Nitrite Interview Questions
4.0
 • 43 Interviews
View all
Aarti Industries Project Engineer Salary
based on 97 salaries
₹1.8 L/yr - ₹8 L/yr
13% less than the average Project Engineer Salary in India
View more details

Aarti Industries Project Engineer Reviews and Ratings

based on 15 reviews

3.4/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

2.7

Salary

3.6

Job security

3.4

Company culture

2.7

Promotions

4.0

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
608 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
579 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
525 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Plant Operator
338 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
321 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Aarti Industries with

Vinati Organics

4.0
Compare

Atul

3.9
Compare

Navin Fluorine International

3.9
Compare

Solvay Specialities

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent