I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
Shuttering in expansion joint columns is done by providing proper gaps to accommodate movement. M30 mix ratio is 1:1:2. How to calculate cutting length with deductions. Concrete strength after 14 days.
Shuttering in expansion joint columns involves providing gaps to allow for movement
M30 design mix ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)
To calculate cutting length, deduct the cover, half of the di...
posted on 9 Apr 2024
M25 is a grade of concrete with a compressive strength of 25 megapascals after 28 days of curing.
M25 is a mix of concrete with a ratio of 1:1:2 (cement:sand:aggregate).
It is commonly used for residential construction, pavements, and small-scale projects.
The strength of M25 concrete is achieved after 28 days of curing.
It is important to follow proper mixing and curing procedures to achieve the desired strength.
To make a BOQ for larger construction work, one must accurately estimate quantities of materials and labor required for each aspect of the project.
Break down the project into smaller components such as foundation, superstructure, finishes, etc.
Calculate the quantities of materials needed for each component based on the project drawings and specifications.
Estimate the labor hours required for each component based on the...
posted on 9 Apr 2024
M25 is a grade of concrete with a compressive strength of 25 megapascals after 28 days of curing.
M25 is a mix of concrete with a ratio of 1:1:2 (cement:sand:aggregate).
It is commonly used for residential construction, pavements, and small-scale projects.
The strength of M25 concrete is achieved after 28 days of curing.
It is important to follow proper mixing and curing procedures to achieve the desired strength.
To make a BOQ for larger construction work, one must accurately estimate quantities of materials and labor required for each aspect of the project.
Break down the project into smaller components such as foundation, superstructure, finishes, etc.
Calculate the quantities of materials needed for each component based on the project drawings and specifications.
Estimate the labor hours required for each component based on the...
based on 7 reviews
Rating in categories
Assistant Manager
584
salaries
| ₹4.5 L/yr - ₹12.8 L/yr |
Deputy Manager
567
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Executive
492
salaries
| ₹2.2 L/yr - ₹7.7 L/yr |
Plant Operator
340
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Senior Executive
334
salaries
| ₹3.3 L/yr - ₹9 L/yr |
Vinati Organics
Atul
Navin Fluorine International
Solvay Specialities