Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There was 1 interview round.
FTTH (Fiber to the Home) work involves installing fiber optic cables directly to individual residences for high-speed internet access.
Surveying the area to plan the fiber optic cable route
Digging trenches or using existing infrastructure to lay the cables
Splicing and connecting the fiber optic cables
Installing termination points in individual homes
Testing the connection to ensure high-speed internet access
Providing cus
Working with fiber involves handling and installing fiber optic cables for data transmission.
Understand the different types of fiber optic cables and their uses
Properly handle and install fiber optic cables to prevent damage
Use specialized tools and equipment for splicing and terminating fiber optic cables
Test and troubleshoot fiber optic connections for optimal performance
Top trending discussions
I applied via campus placement at Indian Institute of Technology (IIT), Roorkee and was interviewed in Nov 2024. There were 3 interview rounds.
General English language and grammar, synonyms
I was asked about research advancement of my institute
Experienced professional with a background in retail management and a proven track record of driving sales and improving team performance.
Over 5 years of experience in retail management
Strong leadership skills with a focus on team development
Proven track record of exceeding sales targets
Excellent communication and problem-solving abilities
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I expect the company to provide opportunities for growth, a positive work environment, and clear communication.
Opportunities for career advancement
Positive work culture
Clear communication channels
I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.
It is not appropriate to discuss previous salary in an interview
Focus on discussing the value you can bring to the company
Emphasize your skills, experience, and qualifications instead of past salary
Intermediate level questions they asked
posted on 30 May 2024
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Turbine stress control is the monitoring and management of mechanical stress levels in turbine components to prevent damage and ensure optimal performance.
Turbine stress control involves monitoring stress levels in turbine components such as blades, rotors, and casings.
The goal is to prevent excessive stress that can lead to fatigue, cracking, or failure of the turbine.
Methods for turbine stress control include regular...
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
How to save inventry cost
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
4
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Project Engineer
4
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Electrical Engineer
4
salaries
| ₹3.2 L/yr - ₹4.7 L/yr |
MIS Executive
4
salaries
| ₹3.4 L/yr - ₹5.6 L/yr |
Circle Head
3
salaries
| ₹7 L/yr - ₹10.1 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International