Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There was 1 interview round.
FTTH (Fiber to the Home) work involves installing fiber optic cables directly to individual residences for high-speed internet access.
Surveying the area to plan the fiber optic cable route
Digging trenches or using existing infrastructure to lay the cables
Splicing and connecting the fiber optic cables
Installing termination points in individual homes
Testing the connection to ensure high-speed internet access
Providing cus
Working with fiber involves handling and installing fiber optic cables for data transmission.
Understand the different types of fiber optic cables and their uses
Properly handle and install fiber optic cables to prevent damage
Use specialized tools and equipment for splicing and terminating fiber optic cables
Test and troubleshoot fiber optic connections for optimal performance
Top trending discussions
I applied via Job Fair
Dynamic programming 3-4 ques
Recursion, DP, Logic building
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
posted on 3 May 2019
I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.
I am currently earning $60,000 per year.
My current salary is $60,000 per year.
I am satisfied with my current salary.
I believe my salary reflects my experience and qualifications.
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
posted on 13 May 2018
I was interviewed before May 2017.
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
posted on 21 Mar 2022
I applied via Referral
posted on 3 Aug 2021
posted on 16 Nov 2021
based on 121 reviews
Rating in categories
Assistant Manager
4
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Project Engineer
4
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Electrical Engineer
4
salaries
| ₹3.2 L/yr - ₹4.7 L/yr |
MIS Executive
4
salaries
| ₹3.4 L/yr - ₹5.6 L/yr |
Circle Head
3
salaries
| ₹7 L/yr - ₹10.1 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Kalpataru Projects International