If you got a part is wrong assembled, then what you will do?
PPM stands for Parts Per Million and is a measurement used to quantify very low concentrations of substances in a mixture.
PPM is calculated by dividing the mass of the solute by the total mass of the solution and multiplying by one million.
For example, if a solution contains 2 grams of solute in 1000 grams of solution, the PPM would be 2000.
PPM is commonly used in fields such as chemistry, environmental science, and ma...
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability: (Operating Time / Planned Production Time) x 100%
Calculate Performance: (Ideal Cycle Time x Total Count) / Operating Time x 100%
Calculate Quality: Good Count / Total Count x 100%
Multiply Availability, Performance, and Quality percentages to get OEE
Top trending discussions
posted on 17 Oct 2024
posted on 25 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Nov 2023. There were 2 interview rounds.
Basic electronic questines
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
posted on 27 Aug 2021
I applied via Walk-in and was interviewed in Nov 2021. There were 4 interview rounds.
posted on 16 Jul 2017
I was interviewed before Jul 2016.
Interview experience
Senior Engineer
316
salaries
| ₹6.2 L/yr - ₹18.2 L/yr |
Technical Lead
223
salaries
| ₹10 L/yr - ₹30 L/yr |
Specialist
156
salaries
| ₹8 L/yr - ₹21.5 L/yr |
Senior Software Engineer
119
salaries
| ₹6 L/yr - ₹16.2 L/yr |
Engineer
61
salaries
| ₹4.2 L/yr - ₹8.5 L/yr |
Bosch
Continental
Mahindra & Mahindra
TCS