Filter interviews by
Bug cycle is the process of identifying, reporting, fixing, retesting, and closing software bugs.
Bug is identified by tester or user
Bug is reported to development team
Development team fixes the bug
Bug is retested to ensure it is resolved
Bug is closed if fixed successfully
NRC in UDS stands for Network Registration Control in User Data Service.
NRC in UDS is a feature that allows network operators to control user access to specific services.
It helps in managing user subscriptions and ensuring secure access to services.
For example, NRC in UDS can be used to restrict access to premium content only to subscribed users.
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross...
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaini...
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
malloc is a function in C used to allocate memory dynamically, while 'new' is an operator in C++ used for the same purpose.
malloc is a function in C, while 'new' is an operator in C++.
malloc returns a void pointer, while 'new' returns a pointer of the specified type.
malloc does not call constructors, while 'new' calls constructors for the allocated memory.
malloc requires manual memory deallocation with free(), whi...
The least count of a vernier scale is the smallest measurement that can be read on the scale.
The least count is determined by the number of divisions on the main scale and the vernier scale.
It is calculated as the difference between one smallest division on the main scale and one division on the vernier scale.
For example, if the main scale has divisions of 1 mm and the vernier scale has 10 divisions between two ma...
Dual mass flywheel is a type of flywheel used in vehicles to reduce vibrations and noise.
Consists of two flywheels connected by springs to absorb vibrations
Used in vehicles with high torque engines to reduce wear and tear on transmission
Commonly found in diesel engines and heavy-duty trucks
Can be more expensive to replace than a single mass flywheel
Windows can be handled using automation tools and techniques.
Use automation tools like Selenium, Appium, or WinAppDriver to interact with windows
Identify windows using unique identifiers like window title, handle, or class name
Perform actions like clicking buttons, entering text, or verifying window properties
Handle pop-up windows or dialogs using appropriate methods
Use exception handling to handle unexpected erro...
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
I appeared for an interview in May 2025, where I was asked the following questions.
I can enhance team efficiency, streamline processes, and foster a positive work environment to achieve organizational goals.
Implement process improvements: For example, I can analyze current workflows and identify bottlenecks, leading to a 20% increase in productivity.
Enhance team collaboration: I can introduce regular team meetings and collaborative tools, improving communication and project outcomes.
Provide mentorshi...
I appeared for an interview in Jul 2024.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Bug cycle is the process of identifying, reporting, fixing, retesting, and closing software bugs.
Bug is identified by tester or user
Bug is reported to development team
Development team fixes the bug
Bug is retested to ensure it is resolved
Bug is closed if fixed successfully
NRC in UDS stands for Network Registration Control in User Data Service.
NRC in UDS is a feature that allows network operators to control user access to specific services.
It helps in managing user subscriptions and ensuring secure access to services.
For example, NRC in UDS can be used to restrict access to premium content only to subscribed users.
malloc is a function in C used to allocate memory dynamically, while 'new' is an operator in C++ used for the same purpose.
malloc is a function in C, while 'new' is an operator in C++.
malloc returns a void pointer, while 'new' returns a pointer of the specified type.
malloc does not call constructors, while 'new' calls constructors for the allocated memory.
malloc requires manual memory deallocation with free(), while 'n...
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
C MCQ questions
Aptitude questions
Technical mcqs
Reasoning mcqs
I am a recent graduate with a degree in engineering, eager to learn and grow in a professional setting.
Recent graduate with a degree in engineering
Passionate about learning and growing in a professional setting
Strong problem-solving skills
Excellent communication and teamwork abilities
Top trending discussions
Some of the top questions asked at the ZF Friedrichshafen interview -
The duration of ZF Friedrichshafen interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 22 interview experiences
Difficulty level
Duration
based on 387 reviews
Rating in categories
Senior Engineer
193
salaries
| ₹6 L/yr - ₹21 L/yr |
Senior Software Engineer
117
salaries
| ₹6.5 L/yr - ₹25 L/yr |
Technical Lead
79
salaries
| ₹9.2 L/yr - ₹27 L/yr |
Assistant Manager
75
salaries
| ₹6 L/yr - ₹17.8 L/yr |
Specialist
61
salaries
| ₹11 L/yr - ₹25 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres