Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
I was interviewed in Jul 2024.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Bug cycle is the process of identifying, reporting, fixing, retesting, and closing software bugs.
Bug is identified by tester or user
Bug is reported to development team
Development team fixes the bug
Bug is retested to ensure it is resolved
Bug is closed if fixed successfully
NRC in UDS stands for Network Registration Control in User Data Service.
NRC in UDS is a feature that allows network operators to control user access to specific services.
It helps in managing user subscriptions and ensuring secure access to services.
For example, NRC in UDS can be used to restrict access to premium content only to subscribed users.
ZF Friedrichshafen interview questions for popular designations
malloc is a function in C used to allocate memory dynamically, while 'new' is an operator in C++ used for the same purpose.
malloc is a function in C, while 'new' is an operator in C++.
malloc returns a void pointer, while 'new' returns a pointer of the specified type.
malloc does not call constructors, while 'new' calls constructors for the allocated memory.
malloc requires manual memory deallocation with free(), while 'n...
Get interview-ready with Top ZF Friedrichshafen Interview Questions
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
C MCQ questions
Aptitude questions
Technical mcqs
Reasoning mcqs
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
Engineering system is a collection of components that work together to achieve a specific goal.
Engineering system involves the integration of various components such as hardware, software, and people.
It is designed to achieve a specific goal or objective.
Examples of engineering systems include transportation systems, communication systems, and manufacturing systems.
Engineering systems are often complex and require inte...
5s culture in automobile refers to the implementation of a systematic approach to workplace organization and cleanliness.
Sort - organizing items and removing unnecessary items from the workplace
Set in order - arranging items in a logical and efficient manner
Shine - cleaning and maintaining the workplace
Standardize - establishing procedures and guidelines for maintaining the workplace
Sustain - ensuring that the 5s cultu...
Top trending discussions
Interview experience
based on 308 reviews
Rating in categories
Senior Engineer
158
salaries
| ₹6 L/yr - ₹21 L/yr |
Senior Software Engineer
99
salaries
| ₹6.5 L/yr - ₹25 L/yr |
Technical Lead
65
salaries
| ₹10.8 L/yr - ₹27.8 L/yr |
Assistant Manager
60
salaries
| ₹6.8 L/yr - ₹15.6 L/yr |
Specialist
49
salaries
| ₹11 L/yr - ₹25 L/yr |
Bosch
Siemens
Mahindra & Mahindra
Tata Motors