i
Zetwerk
Filter interviews by
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I manage the store by ensuring proper inventory management, efficient staff scheduling, and excellent customer service.
Regularly check inventory levels and order products as needed
Create and maintain staff schedules to ensure adequate coverage
Train staff on customer service and sales techniques
Monitor sales and adjust pricing and promotions accordingly
Maintain a clean and organized store layout
Handle customer complaint
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The purchase entry for TDS includes debiting the expense account and crediting the TDS payable account.
Debit the expense account for the amount of the purchase
Credit the TDS payable account for the TDS amount deducted
Example: Debit Purchases account for Rs. 10,000 and Credit TDS Payable account for Rs. 1,000
Zetwerk interview questions for popular designations
I was interviewed in Aug 2022.
Get interview-ready with Top Zetwerk Interview Questions
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
TDS is deducted on purchase exceeding a certain limit
TDS is deducted on purchase exceeding Rs. 50,000 for goods and Rs. 1,00,000 for services
The rate of TDS varies depending on the nature of the transaction and the category of the deductee
TDS is deducted at the time of payment or credit, whichever is earlier
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
Aptitude frequently asking questions i.e finding out age, date, day etc
I applied via Campus Placement and was interviewed before Apr 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
It is an important factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The water cement ratio is typically specified in construction projects to ensure the desired concrete properties.
For example, a water cement ratio of 0.5 means that f...
Slump of concrete refers to the measure of consistency or workability of fresh concrete.
Slump is determined by the vertical settlement of concrete when a cone-shaped mold is removed.
It indicates the flow and compactness of concrete.
Higher slump values indicate more workable and fluid concrete.
Lower slump values indicate less workable and stiffer concrete.
Slump test is conducted to ensure the desired consistency of conc
I applied via Recruitment Consulltant and was interviewed before Sep 2022. There were 3 interview rounds.
Different manufacturing processes and costing involve understanding various methods of production and their associated costs.
Different manufacturing processes can include batch production, mass production, and job production.
Each process has its own cost structure, including direct materials, direct labor, and overhead costs.
Understanding the costing methods such as job order costing, process costing, and activity-base...
Top trending discussions
Some of the top questions asked at the Zetwerk interview -
The duration of Zetwerk interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 112 interviews
Interview experience
based on 811 reviews
Rating in categories
Assistant Manager
133
salaries
| ₹5.5 L/yr - ₹16.5 L/yr |
Site Engineer
85
salaries
| ₹2.2 L/yr - ₹6.7 L/yr |
Manager
73
salaries
| ₹8.5 L/yr - ₹27 L/yr |
Quality Engineer
67
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Senior Engineer
62
salaries
| ₹4.1 L/yr - ₹9.3 L/yr |
Tata Steel
Bharat Forge
Larsen & Toubro Limited
Mahindra & Mahindra